BLD-Final | 10/6/2010 | 10/7/2010 | 10/7/2010 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | PASS |
Tony Young
|
|
|
c of c/o issued
|
BLD-Final | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | FAIL |
Tony Young
|
|
|
Kevin Phone #: ###-####,,0607 need address #s up,, need door removed or change swing between garages
|
BLD-Conference | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Conference | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, conf on exterior drainage,, need reveal and 2% slope away
|
BLD-Conference | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | NH |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Energy code compliance | 5/19/2010 | 5/19/2010 | 5/19/2010 | P | PASS |
Tony Young
|
|
|
Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2010 | 5/17/2010 | 5/17/2010 | A | PART |
Tony Young
|
|
|
kevin Phone #: ###-####,, correction still posted,, conf only,, ok to insulate
|
BLD-Framing/Rough-in | 5/13/2010 | 5/14/2010 | 5/14/2010 | P | FAIL |
Tony Young
|
|
|
kevin Phone #: ###-####,, correction posted
|
BLD-Foundation | 3/4/2010 | 3/5/2010 | 3/5/2010 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, work in progress
|
BLD-Conference | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Tony Young
|
|
|
job status check,, was a SWO
|