BLD-Final | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/3/2010 | 8/5/2010 | 8/5/2010 | A | PASS |
Tom Arcoraci
|
|
|
jim please call 30 min before going out Phone #: ###-####
|
BLD-Final | 8/2/2010 | 8/2/2010 | 8/2/2010 | P | DEFR |
Jim Storey
|
|
|
dave - please call 1/2 hr prior so he can meet you there Phone #: ###-#### needed mech will resch. for wed.
|
BLD-Final | 7/30/2010 | 8/2/2010 | 8/2/2010 | A | NR |
Jim Storey
|
|
|
dave - please call 1/2 hr prior so he can meet you there Phone #: ###-#### need mech final.
|
FIRE-Final Inspection | 7/29/2010 | 7/30/2010 | 7/30/2010 | P | PASS |
Forrest France
|
|
|
Life safety passed, one exit sign repaired while on site.
|
BLD-Energy code compliance | 6/7/2010 | 6/7/2010 | 6/7/2010 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### recieved revised IECC 2006 Envelope compliance to reflect what was instaled. Report aproved and will be archived with aproved plans.
|
BLD-Energy code compliance | 6/4/2010 | 6/4/2010 | 6/4/2010 | P | FAIL |
Jim Storey
|
|
|
Dave Phone #: ###-#### iecc report r-19 in walls. resubmit with r-13 or show how to achive compliance.
|
BLD-Framing/Rough-in | 6/1/2010 | 6/3/2010 | 6/3/2010 | A | PASS |
Jim Storey
|
|
|
david Phone #: ###-####
|
BLD-Energy code compliance | 5/24/2010 | 5/25/2010 | 5/25/2010 | P | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### washer/dryer rm ok to cover.
|
BLD-Framing/Rough-in | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PART |
Jim Storey
|
|
|
###-#### fire blk/ strap top plates at headers
|
BLD-Foundation | 4/26/2010 | 4/26/2010 | 4/26/2010 | P | PASS |
Dave Hannah
|
|
|
Rich Phone #: ###-#### front and back 18inch peirs for deck and oning comm cener
|