BLD-Final | 4/5/2010 | 4/6/2010 | 4/6/2010 | A | PASS |
Mike Jordan
|
|
|
glen Phone #: ###-####
|
DOC - Permit Finaled | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PASS |
Mike Jordan
|
|
|
Letter of completion was issued.
|
BLD-Final | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | NR |
Mike Jordan
|
|
|
Chris-Please call prior to inspection Phone #: ###-####. Called and left message for Chris at above number and noted that he needed an electrical final prior to getting a building final.
|
BLD-Energy code compliance | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Mike Jordan
|
|
|
glen Phone #: ###-####. ok to cover.
|
BLD-Energy code compliance | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | CANC |
Mike Jordan
|
|
|
Glen Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | PASS |
Mike Jordan
|
|
|
Glen Phone #: ###-####. Framing for front shade structure ok.
|
BLD-Foundation | 3/8/2010 | 3/8/2010 | 3/8/2010 | P | PASS |
Mike Jordan
|
|
|
glen Phone #: ###-####. Footings for new patio cover ok. As per approved plans.
|
BLD-Footing | 3/5/2010 | 3/8/2010 | 3/8/2010 | A | NR |
Mike Jordan
|
|
|
Glen ###-####
|
BLD-Framing/Rough-in | 3/8/2010 | 3/8/2010 | 3/8/2010 | A | PART |
Mike Jordan
|
|
|
Glen ###-####. Framing ok. pending electrical rough in inspection. Also verified rigid foam insulation at exterior side of slab for thermal break as noted on approved plans. All framing as per approved plans.
|
BLD-Conference | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | DONE |
Mike Jordan
|
|
|
Glen Phone #: ###-####
|
BLD-Conference | 3/1/2010 | 3/1/2010 | 3/1/2010 | P | DONE |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Met with contractor on site and went over city approved plans and actual work in place and discussed what needed to be repaired to comply with code minimum standards.
|