BLD-Final | 6/18/2010 | 6/21/2010 | 6/21/2010 | A | PASS |
Jim Sly
|
|
|
patricia Phone #: ###-####
|
DOC - Permit Finaled | 6/21/2010 | 6/21/2010 | 6/21/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | PASS |
Jim Sly
|
|
|
Bill ###-####
|
BLD-Framing/Rough-in | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PART |
Jim Sly
|
|
|
Everett Phone #: ###-#### Still forming....Reminded Contr of discrepancies on plan.
|
BLD-Footing | 3/2/2010 | 3/3/2010 | 3/3/2010 | A | PART |
Jim Sly
|
|
|
everett Phone #: ###-#### No string lines pulled,,,,un-able to determine setbacks, Notified Contractor of discrepancies on plan showing 25' setback at North side.......approx. 18' to footing forms as built.
|