BLD-Final | 5/26/2010 | 5/28/2010 | 5/28/2010 | A | PASS |
Jim Storey
|
|
|
Jim; this is a final for one of the Supervalu Office remodel phases. I would like to combine this with another inspection I just requested for the Riverview Building. Please let me know a time that works in your schedule so I can meet you there. Thanks Craig Brown Inspection requested from web by: Craig Brown Phone #: ###-####
|
DOC - Permit Finaled | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/16/2010 | 4/16/2010 | 4/16/2010 | P | PASS |
Forrest France
|
|
|
Craig Inspection requested from web by: Craig Brown Phone #: ###-####
|
FIRE-Final Inspection | 4/15/2010 | 4/15/2010 | 4/15/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, inspection passed.
|
FIRE-Conference | 4/9/2010 | 4/9/2010 | 4/9/2010 | A | DONE |
Forrest France
|
|
|
Site inspection schedule for alarm work and life safety final.
|
BLD-Conference | 4/8/2010 | 4/9/2010 | 4/9/2010 | A | PART |
Jim Storey
|
|
|
greg ###-#### reviewed wall with and with out ele ok to cover upon aproval from ele on walls containing wiring. reviewed ele rm pending nec requriment from bob r
|
FIRE-Conference | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | DONE |
Forrest France
|
|
|
Regarding pending fire alarm permit.
|
BLD-Framing/Rough-in | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | PASS |
Jim Storey
|
|
|
fpp insp with greg call 30 min @ ###-####
|
BLD-Framing/Rough-in | 3/22/2010 | 3/22/2010 | 3/22/2010 | A | CANC |
Jim Storey
|
|
|
|