Permit Information
Permit NumberBLD10-00508
StatusFinaled
Name CAMCO CONSTRUCTION INC
Site Address 350 N MILWAUKEE AVE Unit: 1083
Project NameBTS - #1083 - Apple Store
Customer Number1005
ePlanReviewNo
Description
(Shell and Core - BOISE TOWNE SQUARE - SPACE 1083) Permit to create three new tenant spaces within the existing confines of the mall. Work to include: [installation of interior non-bearing partition walls to create a 1,262 square foot space (space #1081), a 5,553 square foot space (space #1083), a 2,081 square foot space (space #1087), a new elevator equipment room and a new janitors room], relocation of existing structural columns, relocate 1 hour exit passage way, installation of new smoke evacuation system components, and interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: Plan Modification for relocated smoke evacuation system approved. 4-21-10; PLAN MODIFICATION 5-14-10 - Modification submitted to change the second exit location from into the back corridor to directly into the exit enclosure. This relocation will require additional engineering for the new opening and a cane rail installed under the existing stairs. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20107/16/20107/16/2010PPASS
DetailsMike Jordan
DOC - Permit Finaled7/16/20107/16/20107/16/2010PPASS
DetailsMike Jordan
Cane rail has been installed. Letter of compliance was issued.
BLD-Final6/23/20106/23/20106/29/2010PFAIL
DetailsMike Jordan
ray Phone #: ###-####. Needs to install cane rail at stairs.
FIRE-Final Inspection6/23/20106/24/20106/24/2010APASS
DetailsForrest France
early as possible//Ray Phone #: ###-#### NOTE: Smoke evac and fire sprinkler work in progress for tenant improvement permit underway.
BLD-Final6/21/20106/21/20106/21/2010PNR
DetailsMike Jordan
Ray Phone #: ###-####. Needs other trades and fire/life/safety to final first. Contacted and let Ray Know.
BLD-Framing/Rough-in6/8/20106/9/20106/9/2010APASS
DetailsMike Jordan
Ray Andrus Phone #: ###-####Interior steel stud framing for fire partition walls.
BLD-Other5/12/20105/13/20105/14/2010PPASS
DetailsMike Jordan
Re-bar in a grade beam inspection please--concrete pour at 2--Ray ###-####. Reinforcement as per RFI from engineer of record. Will have scanned into permit.
BLD-Footing5/4/20105/5/20105/5/2010PPASS
DetailsMike Jordan
ray Phone #: ###-####. Interior column footings for new columns.