DOC - Permit Finaled | | | 12/16/2010 | | DONE |
Tisha Gallop
|
|
|
passed final inspections 9/14/10
|
BLD-Final | 9/14/2010 | 9/14/2010 | 9/14/2010 | P | PASS |
Dave Hannah
|
|
|
gene Phone #: ###-####
|
FIRE-Final Inspection | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Forrest France
|
|
|
Final fire life safety inspection completed acceptable, two missing escutcheons at the metrology lab to be replaced as discussed.
|
FIRE-Final Inspection | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | CANC |
Forrest France
|
|
|
Overbooked
|
BLD-Final | 9/7/2010 | 9/10/2010 | 9/10/2010 | A | PART |
Dave Hannah
|
|
|
jeff - 10:00 am Phone #: ###-#### ok to final after fire finals
|
BLD-Framing/Rough-in | 8/2/2010 | 8/2/2010 | 8/3/2010 | P | PASS |
Dave Hannah
|
|
|
Jeff Tonkin-Ceiling inspection Phone #: ###-#### ok to cover ceiling grid in corrador
|
FIRE-Final Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 | A | PART |
Forrest France
|
|
|
Fire life safety at the material science lab area completed.
|
FIRE-Final Inspection | 7/1/2010 | 7/2/2010 | 7/7/2010 | P | PART |
Forrest France
|
|
|
Noted areas where EM light locations need revised per approved plan set.
|
BLD-Final | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PART |
Dave Hannah
|
|
|
jeff - partial Phone #: ###-#### ok to start moving in to lab area with equipment
|
FIRE-Final Inspection | 6/29/2010 | 6/30/2010 | 6/30/2010 | A | NR |
Forrest France
|
|
|
Work in progress, construction and finishes underway.
|
BLD-Other | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Dave Hannah
|
|
|
ceiling grid ok to cover
|
BLD-Final | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | CANC |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2010 | 5/28/2010 | 6/1/2010 | P | PASS |
Dave Hannah
|
|
|
ok to cover lid in corr
|
BLD-Conference | 4/22/2010 | 4/22/2010 | 4/23/2010 | P | CANC |
Dave Hannah
|
|
|
Jeff ###-#### Call 30 min. prior......... this was a framing also
|
BLD-Framing/Rough-in | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PASS |
Dave Hannah
|
|
|
Jeff ###-#### Call 30 min. prior......... ok to start covering wall
|
BLD-Framing/Rough-in | 4/21/2010 | 4/22/2010 | 4/22/2010 | A | CANC |
Jim Sly
|
|
|
Jeff-Please call at least 30 mins prior to inspection Phone #: ###-#### Facilities permit......Forward to D Hannah.
|
FIRE-Conference | 4/14/2010 | 4/14/2010 | 4/15/2010 | A | DONE |
Forrest France
|
|
|
Re fire life safety plan review, materials inventory statements.
|