Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD10-00664
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG 5
Customer Number410001
ePlanReviewNo
Description
(HP BLDG 5 - BASEMENT - METROLOGY & MATERIAL SCIENCE LAB) Relocate/reconfigure existing metorlogy Lab & Material Sciene Lab. Project consisted of adding new walls to underside of grid, modifying existing hvac system, and adding new plumbing fixtures which are being relocated, Electrical service is being modified for new users.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/16/2010 DONE
DetailsTisha Gallop
passed final inspections 9/14/10
BLD-Final9/14/20109/14/20109/14/2010PPASS
DetailsDave Hannah
gene Phone #: ###-####
FIRE-Final Inspection9/10/20109/13/20109/13/2010APASS
DetailsForrest France
Final fire life safety inspection completed acceptable, two missing escutcheons at the metrology lab to be replaced as discussed.
FIRE-Final Inspection9/10/20109/10/20109/10/2010PCANC
DetailsForrest France
Overbooked
BLD-Final9/7/20109/10/20109/10/2010APART
DetailsDave Hannah
jeff - 10:00 am Phone #: ###-#### ok to final after fire finals
BLD-Framing/Rough-in8/2/20108/2/20108/3/2010PPASS
DetailsDave Hannah
Jeff Tonkin-Ceiling inspection Phone #: ###-#### ok to cover ceiling grid in corrador
FIRE-Final Inspection7/7/20107/7/20107/7/2010APART
DetailsForrest France
Fire life safety at the material science lab area completed.
FIRE-Final Inspection7/1/20107/2/20107/7/2010PPART
DetailsForrest France
Noted areas where EM light locations need revised per approved plan set.
BLD-Final7/2/20107/6/20107/6/2010APART
DetailsDave Hannah
jeff - partial Phone #: ###-#### ok to start moving in to lab area with equipment
FIRE-Final Inspection6/29/20106/30/20106/30/2010ANR
DetailsForrest France
Work in progress, construction and finishes underway.
BLD-Other6/22/20106/22/20106/22/2010PPASS
DetailsDave Hannah
ceiling grid ok to cover
BLD-Final6/21/20106/22/20106/22/2010ACANC
DetailsDave Hannah
Jeff Phone #: ###-####
BLD-Framing/Rough-in5/28/20105/28/20106/1/2010PPASS
DetailsDave Hannah
ok to cover lid in corr
BLD-Conference4/22/20104/22/20104/23/2010PCANC
DetailsDave Hannah
Jeff ###-#### Call 30 min. prior......... this was a framing also
BLD-Framing/Rough-in4/23/20104/23/20104/23/2010PPASS
DetailsDave Hannah
Jeff ###-#### Call 30 min. prior......... ok to start covering wall
BLD-Framing/Rough-in4/21/20104/22/20104/22/2010ACANC
DetailsJim Sly
Jeff-Please call at least 30 mins prior to inspection Phone #: ###-####
Facilities permit......Forward to D Hannah.
FIRE-Conference4/14/20104/14/20104/15/2010ADONE
DetailsForrest France
Re fire life safety plan review, materials inventory statements.