BLD-Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | P | PASS |
Tom Arcoraci
|
|
|
Forest signed off on the life safety today. Based on the owners business, please schedule your inspection after 1PM. Please call 30 minutes ahead of time and I will meet you at the site. Inspection requested from web by: Craig Brown Phone #: ###-####
|
FIRE-Final Inspection | 6/22/2010 | 6/23/2010 | 6/23/2010 | P | PASS |
Forrest France
|
|
|
Correction items per last site visit finished, inspection passed. No signature card available on site.
|
FIRE-Final Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the north store front door as discussed. I measured the travel distance to the existing main exit and it exceeded 75' so this north door is required and can not be deleted. The rear exit door in the storage area needs the thumbturn lock removed and single action hardware installed.
|
BLD-Final | 5/26/2010 | 5/28/2010 | 5/28/2010 | A | CANC |
Jim Storey
|
|
|
Jim; this is a final for a small TI Restaurant space, tres bonne cuisine. If the timing works, we can cover this along with the Supervalu office inspection finals. Thanks Craig Brown Inspection requested from web by: Craig Brown Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2010 | 4/29/2010 | 4/29/2010 | A | PASS |
Jim Storey
|
|
|
jeremy Phone #: ###-####
|