BLD-Final | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Mike Jordan
|
|
|
Brian -please call at least 30 mins prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Mike Jordan
|
|
|
certificate of compliance issued.
|
FIRE-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | CANC |
Jim Sly
|
|
|
bill Phone #: ###-####
|
BLD-Final | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | NR |
Jim Sly
|
|
|
bill Phone #: ###-#### Need Fire final.
|
FIRE-Conference | 7/8/2010 | 7/8/2010 | 7/8/2010 | P | DONE |
Troy Cobbley
|
|
|
I notified the general contractor that it is very possible that fire alarm system modifications will be required due to the new wall blocking coverage of an existing horn/strobe. Any modifications would require a permit.
|
BLD-Framing/Rough-in | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | PASS |
Jim Sly
|
|
|
please call 1/2 hr before going out so can meet//Bill ###-####
|