BLD-Final | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Mike Jordan
|
|
|
Fire final at 10 AM, Fire Alarm Test Final also, Shelving final also requested on seperate permit. Phone #: ###-#### >> Inspection requested via web by Jim LeRoy. Ok for perm. occupancy.
|
FIRE-Final Inspection | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The smoke evac system had to be repaired while I was on site.
|
BLD-Conference | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | DONE |
Mike Jordan
|
|
|
Mark w/Fire has given a verbal OK for stock and set up, permit and final still possible for today, elect final this morning Phone #: ###-#### >> Inspection requested via web by Jim LeRoy
|
BLD-Other | 8/26/2010 | 8/26/2010 | 8/26/2010 | A | PART |
Mike Jordan
|
|
|
above clg at grid ceiling areas. Phone #: ###-#### >> Inspection requested via web by Jim LeRoy. Needs to add wires to diffusers.
|
BLD-Framing/Rough-in | 8/17/2010 | 8/18/2010 | 8/18/2010 | A | PASS |
Mike Jordan
|
|
|
ceiling framing sales floor, mech, elect & fire passed already Phone #: ###-#### >> Inspection requested via web by Jim LeRoy
|
BLD-Framing/Rough-in | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Tom Arcoraci
|
|
|
sales floor walls Phone #: ###-#### >> Inspection requested via web by Jim LeRoy
|
BLD-Framing/Rough-in | 7/19/2010 | 7/20/2010 | 7/20/2010 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Interior steel stud walls for back room only. no grid.
|
FIRE-Conference | 6/28/2010 | 6/28/2010 | | P | |
Forrest France
|
|
|
Jim Phone #: ###-#### or Mike ###-####
|