BLD-Final | 11/3/2010 | 11/4/2010 | 11/4/2010 | A | PASS |
Jim Storey
|
|
|
Justin-Please call 30 mins prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 9/29/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection after corrections made while on site, door and hardware at the folding partition wall not yet installed to be verified at structural final as agreed.
|
BLD-Final | 9/29/2010 | 9/30/2010 | 9/30/2010 | P | PART |
Jim Storey
|
|
|
justin Phone #: ###-#### temp occ ok pending bi-folding wall instaltion.
|
BLD-Framing/Rough-in | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 8/25/2010 | 8/25/2010 | 8/26/2010 | P | PART |
Forrest France
|
|
|
Okayed overhead fire sprinkler system modifications for cover at the drop ceilings.
|
BLD-Framing/Rough-in | 8/23/2010 | 8/24/2010 | 8/24/2010 | P | PART |
Jim Storey
|
|
|
Above ceiling inspection please-Justin Phone #: ###-#### east side of the building ok to cover ceilling.
|
FIRE-Conference | 8/4/2010 | 8/5/2010 | 8/5/2010 | A | DONE |
Forrest France
|
|
|
On site conference regarding the existing fire damper at the first floor lobby, project related fire alarm permit work, new door at the corridor, project schedule, etc.
|
FIRE-Conference | 7/29/2010 | 7/29/2010 | 7/29/2010 | A | DONE |
Forrest France
|
|
|
Regarding existing dampers.
|
BLD-Framing/Rough-in | 7/26/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|