Permit Information
Permit NumberBLD10-01564
StatusFinaled
Name VERTICAL CORP
Site Address 623 S AMERICANA BLVD
Project NameOEC AMERICANA
Customer Number 
ePlanReviewNo
Description
(OEC - OFFICE ENVIRONMENT COMPANY - AMERICANA) This building is required to be fire sprinklered for building area increase, for story increase, and for fire area. To remodel an existing building for a new retail sales and warehouse tenant. After the remodel, this building will have a 16,814 square foot 1st story and a 3,860 square foot 2nd story. Work is to include a single user restroom accessible to the disabled, a roll-in-type shower and a locker room accessible to the disabled, a new stairway to serve the 2nd story, a new floor structure next to the new stairway, new exterior walls, exterior windows, exterior doors, interior walls, interior wall infills, and interior finishes. This permit also includes removing about 11,500 square feet of the floor of the existing 2nd story and demolishing and rebuilding the long narrow section of building parallel to and adjacent to Americana Boulevard. Structural work includes new openings in existing masonry walls, shear walls, bearing walls, window headers, roof joists, column splice connections, and pilaster patching. This permit does NOT include the installation of storage racks. A separate permit for high rack storage is required. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Planning approval done under DRH10-00142. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/25/20114/25/20114/30/2011 PASS
DetailsDave Hannah
BLD-Final2/18/20112/22/20112/22/2011PPASS
DetailsDave Hannah
John Phone #: ###-####
FIRE-Final Inspection2/8/20112/8/20112/9/2011PPASS
DetailsForrest France
Site visit to confirm west side main entry exit sign and EM discharge light installation.
BLD-Final2/2/20112/2/20112/2/2011PPART
DetailsDave Hannah
Jason Phone #: ###-#### ok for temp occ ok for prem occ after elec gos perm and sink in break room is lowered
FIRE-Final Inspection2/1/20112/2/20112/2/2011APASS
DetailsForrest France
Fire life safety passed. Partitions at office and conference room to be verified at structural final per discussion.
FIRE-Conference1/28/20111/31/20111/31/2011ADONE
DetailsForrest France
On site conference regarding fire life safety items, fire code review notes, plan red-lines, project related trade permit issues.
BLD-Final1/27/20111/28/20111/28/2011PCANC
DetailsDave Hannah
joe - please call 1/2 hr prior Phone #: ###-####
BLD-Other1/18/20111/18/20111/18/2011PPART
DetailsDave Hannah
joe - suspended ceiling Phone #: ###-#### ok to cover ceiling
FIRE-Sprinkler Rough-in12/20/201012/20/201012/20/2010APART
DetailsForrest France
Okay to cover sprinkler work at the south end stairway intermediate landing.
BLD-Energy code compliance12/9/201012/10/201012/10/2010APASS
DetailsDave Hannah
Joe-Late am-PLease call prior to going for inspection Phone #: ###-####
BLD-Energy code compliance12/6/201012/7/201012/7/2010APASS
DetailsTom Arcoraci
joe - please call 1/2 hr prior Phone #: ###-####
BLD-Framing/Rough-in11/22/201011/23/201011/24/2010PPASS
DetailsDave Hannah
Joe Phone #: ###-####
BLD-Footing10/26/201010/26/201010/27/2010PPASS
DetailsDave Hannah
joe - late afternoon

please Phone #: ###-####
BLD-Footing10/25/201010/26/201010/26/2010ACANC
DetailsDave Hannah
joe - late morning please Phone #: ###-####
BLD-Footing10/19/201010/20/201010/20/2010APASS
DetailsDave Hannah
Joe-rebar inspection please Phone #: ###-#### int stairs ok to pour ftgs