Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-01595
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 4274 N EAGLE RD
Project NameAll About You Dental
Customer Number 
ePlanReviewNo
Description
"All About You" Dental - To construct a new 4,510 square foot, two story, wood framed dental office and related site improvement. First Floor: 3,990 square feet, Second Floor: 520 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/25/20115/26/20115/26/2011APASS
DetailsJim Sly
Dave Phone #: ###-####
OK for Perm Occ.
BLD-Final5/24/20115/24/20115/25/2011PPART
DetailsJim Sly
Dave Bashishta Phone #: ###-####
OK for Temp Occ.....OK for Perm when Plumbing Perms.
BLD-Final5/19/20115/20/20115/20/2011PCANC
DetailsJim Sly
Dave ###-#### NR Need Plumb.
BLD-Conference5/18/20115/19/20115/19/2011ADONE
DetailsJim Sly
Dave Phone #: ###-####
FIRE-Final Inspection5/18/20115/18/20115/18/2011PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection5/16/20115/17/20115/17/2011AFAIL
DetailsTroy Cobbley
Provide vent within 6" of the ceiling, provide NFPA hazard sign and provide fire dept access signage as discussed.
BLD-Other2/24/20112/24/20112/24/2011PPASS
DetailsJim Sly
dave - grid inspection Phone #: ###-####
BLD-Framing/Rough-in1/28/20111/28/20111/28/2011PPASS
DetailsMike Jordan
Grid inspection please-Dave Phone #: ###-####
BLD-Framing/Rough-in1/3/20111/4/20111/4/2011PPASS
DetailsJim Sly
Dave please call 1 hr before going out Phone #: ###-####
BLD-Energy code compliance12/22/201012/23/201012/27/2010PPASS
DetailsJim Sly
dave Phone #: ###-####
BLD-Framing/Rough-in12/20/201012/21/201012/21/2010APASS
DetailsJim Sly
Dave Phone #: ###-#### Foam seal....truss bracing and stud shoe.....OK
BLD-Framing/Rough-in12/17/201012/20/201012/20/2010APART
DetailsMike Jordan
Dave Phone #: ###-####. Provide lateral bracing on T21 and 22 trusses, Stud shoe on notrh wall at gas pipe and complete foam seal at top plates and bottom plates.
BLD-Framing/Rough-in12/1/201012/2/201012/2/2010APART
DetailsJim Sly
Call before arrival--Dave Phone #: ###-####
Verified double rock soffit and fascia....double rock boxes above can lights in areas closer than 10' to property line. Shear inspection......OK.
BLD-Other11/23/201011/24/201011/24/2010PPART
DetailsMike Jordan
dave - shear wall Phone #: 941-. Exterior shear nailing only ok.
BLD-Foundation11/3/201011/5/201011/5/2010APASS
DetailsJim Sly
Bill Phone #: ###-####
BLD-Footing11/3/201011/4/201011/4/2010PPASS
DetailsJim Sly
Bill Phone #: ###-####