BLD-Final | 4/27/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Jim Storey
|
|
|
Call 30min prior---Dave Phone #: ###-####
|
DOC - Permit Finaled | 4/28/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/27/2011 | 4/27/2011 | 4/27/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety okay to final. Project related FIR permit work is complete.
|
FIRE-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | PART |
Forrest France
|
|
|
Fire alarm permit FIR11-00134 issued 3/24 for scope of changes to the existing system due to remodel work.
|
BLD-Aging Inspection | 2/22/2011 | 2/22/2011 | 2/23/2011 | | PASS |
Jim Storey
|
|
|
fir isues Conversation with John Schafer regarding project related fire alarm work and FIR permit for modification to the existing system due to remodel.
|
FIRE-Conference | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | DONE |
Forrest France
|
|
|
Conversation with John Schafer regarding project related fire alarm work and FIR permit for modification to the existing system due to remodel.
|
FIRE-Final Inspection | 10/28/2010 | 10/29/2010 | 10/29/2010 | A | PART |
Forrest France
|
|
|
Fire life safety final pending an issued fire alarm permit and site inspection for functionality at the relocated notification appliance in the womens restroom remodel.
|
FIRE-Conference | 10/14/2010 | 10/14/2010 | 10/15/2010 | P | DONE |
Forrest France
|
|
|
Regarding fire alarm work.
|
FIRE-Conference | 10/7/2010 | 10/7/2010 | 10/8/2010 | P | DONE |
Forrest France
|
|
|
Conversation with general contractor on site regarding the need for fire alarm system modifications due to the remodel work. Fire alarm permit req.
|
BLD-Framing/Rough-in | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | PASS |
Jim Storey
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 10/5/2010 | 10/6/2010 | 10/6/2010 | A | NR |
Jim Storey
|
|
|
Dave Phone #: ###-####
|