Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-01915
StatusFinaled
Name RUSH KEVIN E
Site Address 5000 S DESELM WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
9-13-2010 THIS PROJECT IS MODIFIED TO REFLECT A NEW FULLY ENGINEERED CONCRETE RETAINING WALL SYSTEM AT THE UPHILL SIDE OF THE STRUCTURE 9-13-2010. N / A ADDED VALUE. Permit for the construction of a 1,200 sq. ft. accessory building for R.V storage with work to include grading, foundation and building construction. All work to be done per the approved plans. Provide ES report or UL listing to the inspector at time of inspection. R-1C zoning, CZC10-00176 and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/28/201010/29/201010/29/2010APASS
DetailsTom Arcoraci
kenny Phone #: ###-####
DOC - Permit Finaled10/29/201010/29/201010/29/2010PPASS
DetailsTom Arcoraci
BLD-Final10/27/201010/28/201010/28/2010ANR
DetailsMike Jordan
Kenny Phone #: ###-####. Needs to add bracing on bottom chords.
BLD-Framing/Rough-in10/5/201010/6/201010/6/2010APART
DetailsJim Storey
kenny Phone #: ###-#### brace bottom chord if no ceilling. framinf ok
BLD-Foundation9/22/20109/22/20109/22/2010PPASS
DetailsDave Hannah
tim Phone #: ###-#### retainning walls ok to pour
BLD-Footing9/20/20109/21/20109/21/2010APASS
DetailsTom Arcoraci
Tim Phone #: ###-####
BLD-Footing8/31/20109/1/20109/1/2010APASS
DetailsJim Storey
kenny Phone #: ###-####
BLD-Footing8/25/20108/26/20108/26/2010ANR
DetailsJim Storey
Kenny Phone #: ###-####