BLD-Final | 12/10/2010 | 12/10/2010 | 12/13/2010 | P | DONE |
Jim Storey
|
|
|
|
BLD-Final | 12/10/2010 | 12/13/2010 | 12/13/2010 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/13/2010 | 12/13/2010 | 12/13/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/9/2010 | 12/10/2010 | 12/10/2010 | A | PART |
Jim Storey
|
|
|
9:00 appt. w/ron on site ok for final pending plm
|
FIRE-Conference | 11/1/2010 | 11/2/2010 | 11/3/2010 | A | DONE |
Forrest France
|
|
|
On site inspection for seven beam clamps and retainer straps at the new batch room above the hard lid ceiling okayed.
|
BLD-Framing/Rough-in | 11/2/2010 | 11/2/2010 | 11/2/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/29/2010 | 11/1/2010 | 11/1/2010 | P | PASS |
Jim Storey
|
|
|
ceiling grid insp//Ron Phone #: ###-####
|
BLD-Other | 11/1/2010 | 11/1/2010 | 11/1/2010 | A | PASS |
Jim Storey
|
|
|
ceilling insp. ron
|
BLD-Footing | 9/30/2010 | 10/1/2010 | 10/1/2010 | P | PASS |
Jim Storey
|
|
|
1:00 apointment ron - right after lunch if possible, please Phone #: ###-####
|
BLD-Foundation | 9/29/2010 | 9/30/2010 | 9/30/2010 | P | DEFR |
Jim Storey
|
|
|
ron - right after lunch if possible, please Phone #: ###-####
|
BLD-Footing | 9/29/2010 | 9/29/2010 | 9/29/2010 | P | PASS |
Jim Storey
|
|
|
ron - right after lunch if possible, please Phone #: ###-####
|