BLD-Final | 9/24/2010 | 9/27/2010 | 9/27/2010 | A | PASS |
Tony Young
|
|
|
junior Phone #: ###-####
|
FIRE-Final Inspection | 9/24/2010 | 9/27/2010 | 9/27/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety passed, C/N items complete.
|
DOC - Permit Finaled | | | 9/27/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | NR |
Tony Young
|
|
|
Jr Phone #: ###-####,, needs trades
|
FIRE-Conference | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | DONE |
Forrest France
|
|
|
Discussed with contractor on site items needed for final. Project is not in condition for final approval at this time.
|
BLD-Framing/Rough-in | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Jim Sly
|
|
|
Junior phone
|
BLD-Framing/Rough-in | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | CANC |
Jim Sly
|
|
|
Junior Phone #: ###-#### Re-sched for Wed. AM
|
BLD-Framing/Rough-in | 9/20/2010 | 9/21/2010 | 9/21/2010 | A | PART |
Dave Hannah
|
|
|
Jr Phone #: ###-#### ok to cover steel stud wall
|