Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-02136
StatusFinaled
Name CLARK HOMES
Site Address 8 S MESA VISTA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"1-5-2011 THIS PERMIT IS MODIFIED TO REFLECT THE MODIFICATION OF AND . ADDITION OF A NEW 54S.F HVAC ROOM TO EXISTING P00LHOUSE. ADDED VALUE TO THIS PROJECT IS $50,000.00. 1-5-2011. pep Permit for the addition and remodel of an existing single family dwelling with work to include the addition of a 3 car garage and the remodel of the master suite and nstallation of a new custom skylite. Provide skylite specifications and installation requirements to the structural inspector at the time of inspection. All work to be done per the approved plans, plan review report, any notations and the attached engineeting. R-1C zoning and setbacks per planning. NO HILLSIDE REQUIREMENTS PER TERRY RECORDS ALL CONSTRUCTION ACTIVITIES ARE OUT OF THE HILLSIDE AREA CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/24/20115/24/20115/24/2011PPASS
DetailsJim Storey
MARK please call 30 min before going out so he can be there to unlock the door Phone #: ###-####
DOC - Permit Finaled5/24/20115/24/20115/24/2011PPASS
DetailsJim Storey
BLD-Final5/18/20115/18/20115/18/2011PNR
DetailsJim Storey
Call 30min prior--Mark Phone #: ###-#### needs plm final.
BLD-Energy code compliance3/10/20113/11/20113/11/2011APASS
DetailsJim Storey
mark - as early as possible please Phone #: ###-#### pool house
BLD-Final3/8/20113/9/20113/9/2011ANR
DetailsTom Arcoraci
marshall - inspection for temp occupancy Phone #: ###-#### ok to move in furniture if ok with elec inspector
BLD-Framing/Rough-in3/2/20113/3/20113/3/2011APASS
DetailsJim Sly
marshal Phone #: ###-####
BLD-Foundation2/3/20112/3/20112/3/2011PPASS
DetailsJim Storey
dave Phone #: ###-####
BLD-Conference1/20/20111/20/20111/20/2011PPASS
DetailsJim Storey
work in progress.
BLD-Aging Inspection1/20/20111/20/20111/20/2011 PASS
DetailsJim Storey
BLD-Energy code compliance11/12/201011/15/201011/15/2010APASS
DetailsJim Storey
marshall Phone #: ###-####
BLD-Framing/Rough-in11/5/201011/8/201011/8/2010APART
DetailsJim Storey
Marshall Phone #: ###-#### strap mlb at top plate. ok to insulate.
BLD-Foundation9/30/20109/30/20109/30/2010PPASS
DetailsJim Storey
robert Phone #: ###-####
BLD-Footing9/28/20109/29/20109/29/2010PPASS
DetailsJim Storey
Robert if possible early afternoon Phone #: ###-####
BLD-Other9/21/20109/21/20109/21/2010PPASS
DetailsTom Arcoraci
shear wall inspection//Mark ###-####