Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02374
StatusFinaled
Name ADA COUNTY ASSOC OF REALTORS
Site Address 9550 W BETHEL CT
Project Name 
Customer Number 
ePlanReviewNo
Description
(ADA COUNTY ASSOCIATION OF REALTORS) Remodel for an existing office tenant creating a new assembly training room and minor exterior modification at entrance door per approved plans. Work to include select interior demolition; framing & finish infill at doors removed; interior non-bearing walls; new doors and hardware per plans; accessible millwork in board room, training rooms, reception areas, office 106, break room 140, restrooms 143 & 144 and office 149; electrical, mechanical, plumbing and alarm systems work; new entry structural canopy with roof covering and new exterior door, hardware and landing, all per reviewed plans and attached plan review conditions / comments of all reviewing agencies. Building Official and Fire Marshal alternate approval attached allowing building to be over area by 59 sq. ft., because of new A-3 training room occupancy, with smoke detection/alarm system installed throughout building and additional exit doors (six shown) from the building. NOTE: This building is required to have smoke detection with an alarm system throughout the building per building official an fire marshal alternate approval. Planning approvals per CZC10-00185 and CZC10-00197. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/4/20113/7/20113/7/2011APASS
DetailsMike Jordan
Robert Phone #: ###-####. ok for pedrm occ.
FIRE-Final Inspection3/4/20113/4/20113/4/2011PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection3/3/20113/4/20113/4/2011AFAIL
DetailsTroy Cobbley
Provide final for the project related fire alarm permit. Remove the dead bolt on the office door and remove the outdated fire extinguisher in the break room.
BLD-Framing/Rough-in2/9/20112/10/20112/10/2011APASS
DetailsMike Jordan
robert - ###-#### - phase 2. Glue lam installation for new sliding partition wall.
BLD-Framing/Rough-in12/21/201012/22/201012/22/2010APASS
DetailsMike Jordan
Robert Phone #: ###-####. South overbuild phase 1.
BLD-Framing/Rough-in12/6/201012/7/201012/7/2010PPASS
DetailsMike Jordan
robert Phone #: ###-####. Interior wood framed walls for phse 1 ok.
BLD-Framing/Rough-in12/1/201012/2/201012/2/2010APART
DetailsMike Jordan
Robert Phone #: ###-####. Interior wood framed walls only. Pendind electrical and plumbing rough in inspections.