BLD-Final | 12/21/2010 | 12/23/2010 | 12/23/2010 | A | PASS |
Dave Hannah
|
|
|
mike and office number ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 12/21/2010 | 12/22/2010 | 12/22/2010 | P | PASS |
Forrest France
|
|
|
PFE installed while on site, fire life safety passed.
|
BLD-Framing/Rough-in | 12/14/2010 | 12/15/2010 | 12/15/2010 | A | PASS |
Dave Hannah
|
|
|
Dennis--Acoustical ceiling cover inspection please Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2010 | 12/7/2010 | 12/7/2010 | A | PASS |
Tom Arcoraci
|
|
|
mike or marva Phone #: ###-#### or ###-####
|
BLD-Framing/Rough-in | 12/1/2010 | 12/2/2010 | 12/2/2010 | A | PART |
Dave Hannah
|
|
|
Dennis Phone #: ###-#### ok to cover corridor wall
|
BLD-Framing/Rough-in | 12/1/2010 | 12/1/2010 | 12/1/2010 | P | CANC |
Dave Hannah
|
|
|
Dennis Raistrick ###-####//cancelled per Dennis 11:12am 12/1/10 leg
|