BLD-Final | 4/13/2011 | 4/14/2011 | 4/15/2011 | P | PASS |
Tony Young
|
|
|
key is in electrical box in the front of the house. Phone #: ###-#### >> Inspection requested via web by Todd Blackwell,, c of o issued
|
DOC - Permit Finaled | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 2/23/2011 | 2/24/2011 | 2/24/2011 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
|
BLD-Framing/Rough-in | 2/23/2011 | 2/23/2011 | 2/24/2011 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
|
BLD-Energy code compliance | 2/16/2011 | 2/23/2011 | 2/24/2011 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell,, seal package ok,, ok to insulate
|
BLD-Framing/Rough-in | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
|
BLD-Framing/Rough-in | 2/16/2011 | 2/22/2011 | 2/23/2011 | A | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 2/14/2011 | 2/14/2011 | 2/15/2011 | A | PART |
Tony Young
|
|
|
pat Phone #: ###-####,, ext shear,, will get papers/engineering change from simpson wall to portal frame at regular frame inspection
|
BLD-Framing/Rough-in | 2/11/2011 | 2/11/2011 | 2/14/2011 | P | PART |
Tony Young
|
|
|
pat Phone #: ###-####,, exterior shear ok pending letter on change on simpson wall
|
BLD-Foundation | 1/13/2011 | 1/13/2011 | 1/13/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 1/12/2011 | 1/13/2011 | 1/13/2011 | A | CANC |
Tom Arcoraci
|
|
|
Geotech report in 1-12/11 afternoon-as close to noon as possible--Pat Phone #: ###-####
|