BLD-Final | 1/5/2011 | 1/7/2011 | 1/7/2011 | P | FAIL |
Dave Hannah
|
|
|
Scope: Framing (Shear Nail)Contact: Dave @ ###-####Call in advance please no plns on site
|
FIRE-Final Inspection | 1/6/2011 | 1/7/2011 | 1/7/2011 | A | PASS |
Forrest France
|
|
|
Items on correction notice verified for completion. Life safety passed.
|
FIRE-Final Inspection | 1/5/2011 | 1/6/2011 | 1/6/2011 | P | FAIL |
Forrest France
|
|
|
Noted some items on the corrections list still incomplete including building address numbers, door hardware at the main entry. No access to the interior for verification of the remaining items.
|
BLD-Final | 1/3/2011 | 1/5/2011 | 1/5/2011 | A | CANC |
Dave Hannah
|
|
|
Randy please call 30 min before going out so Randy can let you in. Phone #: ###-####
|
FIRE-Final Inspection | 1/3/2011 | 1/4/2011 | 1/5/2011 | P | FAIL |
Forrest France
|
|
|
Correction items include; post building address, provide approved hardware and signage at the main entry/exit door, post two fire extinguishers with current certification tags as discussed, repair exit sign at the east exit, remove paper signage at one location. See permit documents for details.
|