BLD-Final | 6/30/2011 | 7/1/2011 | 7/1/2011 | A | PASS |
Tom Arcoraci
|
|
|
jessie Phone #: ###-####
|
BLD-Final | 6/28/2011 | 6/29/2011 | 6/30/2011 | P | NR |
Dave Hannah
|
|
|
scott Phone #: ###-####
|
BLD-Conference | 6/22/2011 | 6/23/2011 | 6/24/2011 | A | PASS |
Dave Hannah
|
|
|
scott Phone #: ###-#### they are finishing up showers
|
BLD-Conference | 5/31/2011 | 5/31/2011 | 6/3/2011 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 3/23/2011 | 3/23/2011 | 3/23/2011 | A | PASS |
Forrest France
|
|
|
Ref. activity notes 2/28- Final okay pending.
|
BLD-Final | 2/24/2011 | 2/28/2011 | 2/28/2011 | P | PART |
Dave Hannah
|
|
|
Scott Phone #: ###-#### ok for temp occ but needs to finish showers and andrail returns ada restrooms signage door hardwear
|
FIRE-Final Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | P | PASS |
Forrest France
|
|
|
Life safety reinspection passed with the exception of shower rooms not yet finished- structural final pending as agreed.
|
FIRE-Final Inspection | 2/24/2011 | 2/28/2011 | 2/28/2011 | A | FAIL |
Forrest France
|
|
|
Correction items include; provide approved door hardware at three locations- both restrooms and the new office, post three fire extinguishers per plan with current certification tags, post max. occupant load signage per review notes. Scope of work as indicated is not yet finished at the new shower rooms per stamped plan.
|