BLD-Conference | 5/31/2011 | 6/1/2011 | 6/10/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | PASS |
Dave Hannah
|
|
|
matthew - the approved plans are sitting on the landing behind the door Phone #: ###-#### ok for perm occ
|
BLD-Final | 4/21/2011 | 4/21/2011 | 4/22/2011 | P | FAIL |
Dave Hannah
|
|
|
Late afternoon--Matthew Phone #: ###-#### needs a 180 min door in 3hr fire wall
|
FIRE-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | PASS |
Forrest France
|
|
|
Corrections completed- Inspection passed. Fire life safety finaled.
|
BLD-Final | 4/19/2011 | 4/20/2011 | 4/21/2011 | P | CANC |
Dave Hannah
|
|
|
matthew please call 30 min before going out Phone #: ###-####
|
FIRE-Final Inspection | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | FAIL |
Forrest France
|
|
|
Smoke detector at the south side did not release door hold as designed.
|
FIRE-Final Inspection | 4/13/2011 | 4/13/2011 | 4/13/2011 | P | PART |
Forrest France
|
|
|
Work in progress. Exit signs, doors and hardware, fire extinguishers are done.
|
FIRE-Conference | 3/30/2011 | 3/31/2011 | 3/31/2011 | A | DONE |
Forrest France
|
|
|
On site conference with contractor and tenant regarding plan review red line notes and fire life safety items.
|
FIRE-Conference | 3/14/2011 | 3/14/2011 | 3/15/2011 | P | DONE |
Forrest France
|
|
|
Regarding door operations at the rated wall.
|