BLD-Final | 10/3/2014 | 10/3/2014 | 10/10/2014 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/10/2014 | 10/10/2014 | 10/10/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/29/2014 | 9/29/2014 | 10/3/2014 | | PEND |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Aging Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | A | DONE |
Forrest France
|
|
|
Okayed for project final- Fire alarm work finished in coordination with FIR13-00682.
|
BLD-Aging Inspection | 6/25/2014 | 6/25/2014 | 6/30/2014 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/14/2014 | 3/14/2014 | 3/19/2014 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/16/2013 | 10/16/2013 | 10/23/2013 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/13/2013 | 3/14/2013 | 3/14/2013 | A | DEFR |
Dave Hannah
|
|
|
|
FIRE-Conference | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | DONE |
Forrest France
|
|
|
Project related fire alarm permit in review status.
|
FIRE-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 | A | PART |
Forrest France
|
|
|
Door hardware and fire sprinkler work has been finished. Final pending alarm system permit work.
|
FIRE-Conference | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | DONE |
Forrest France
|
|
|
Regarding C/N items.
|
BLD-Final | 2/10/2011 | 2/11/2011 | 2/14/2011 | A | CANC |
Dave Hannah
|
|
|
call when on way//Ken Phone #: ###-####
|
FIRE-Final Inspection | 2/11/2011 | 2/11/2011 | 2/11/2011 | P | FAIL |
Forrest France
|
|
|
Modifications to the existing building fire alarm and sprinkler system are necessary due to the scope of remodel work- provide notification at the new conference room, fire sprinkler coverage opposite the new wall is overspaced. Keyed locking deadbolt at the exit door to be removed.
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PASS |
Dave Hannah
|
|
|
ken Phone #: ###-####
|