Description
(12th & River Senior Apartments) To construct a three story, 53 unit, senior apartment housing with enclosed parking and associated amenities, a total area of 60,279 sq. ft. (1st - 22,940 sf / 2nd - 18,737 sf / 3rd - 18,602 sf). There are 52 units of 614 sf and one unit of 772 sf. There are three Type 'A' Accessible units and 50 Type 'B' Accessible units. Building is wood frame non-rated construction, fully sprinklered with NFPA 13 system; 1/2 hour fire-resistive fire partitions for corridor wall & corridor lid construction; walls between sleeping units / dwelling units shall be 1/2 hour fire-resistive fire partitions; 1/2 hour horizontal fire-resistive assembly between units and bewteen other occupancies unless a full 1-hour assembly is required to separate mixed use occupancies; 1-hour fire-resistive fire barrier walls and 1-hour fire-resistive horizontal assemblies between mixed use occupancies of "A" & "R" and "R" & "S2" (sheet A0.1) and at stair enclosure separation. Electrical, mechanical, plumbing, fire sprinkler and alarm systems; interior finishes and millwork in accordance with reviewed plans and all attached plan reviews and red-lined comments of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20127/16/20127/16/2012PPASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Final Inspection7/13/20127/16/20127/16/2012PPASS
DetailsForrest France
FIRE-Final Inspection7/13/20127/16/20127/16/2012APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
FIRE-Final Inspection7/13/20127/13/20127/13/2012PCANC
DetailsTroy Cobbley
Overbooked due to inspection load. Contractor notified.
FIRE-Final Inspection7/11/20127/13/20127/13/2012ACANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection7/11/20127/12/20127/12/2012PNR
DetailsForrest France
Gary ###-#### >> Inspection requested via web by Gary Simon
BLD-Wall cover6/7/20126/7/20126/7/2012PPASS
DetailsDave Hannah
Dave, you are going to be looking at the rockwool at the last window. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/23/20125/24/20125/25/2012APASS
DetailsDave Hannah
Dave, this is the rockwool at the 2nd and 3rd floors. As early as possible Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/22/20125/22/20125/24/2012PPASS
DetailsDave Hannah
Cover - ceilings Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/22/20125/23/20125/23/2012PPASS
DetailsDave Hannah
Ceiling cover in the garage. Early pm if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/15/20125/15/20125/15/2012PPASS
DetailsMike Jordan
Soffit cover 1st floor. Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Sprinkler Rough-in5/14/20125/14/20125/14/2012PPART
DetailsForrest France
Fire sprinkler work at the 1st floor common area soffits okayed for cover.
BLD-Other5/10/20125/11/20125/11/2012APART
DetailsMike Jordan
Soffit inspection 1st floor Phone #: ###-#### >> Inspection requested via web by Gary Simon. North and south portions, coridor area not ready. All fire stop and column encasement ok at soffit.
BLD-Other5/2/20125/3/20125/4/2012PPASS
DetailsDave Hannah
Ceiling cover of soffits. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover soffits third floor west side
BLD-Framing/Rough-in4/26/20124/27/20124/27/2012APART
DetailsDave Hannah
Dave, we are inspecting the garage ceiling. Phone #: ###-#### >> Inspection requested via web by Gary Simon east third ok to cover
BLD-Energy code compliance4/17/20124/18/20124/20/2012APASS
DetailsDave Hannah
Dave, I need you to look at one more exterior wall. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover ceiling in north stair tower sheet rocking go good and insulation also ok
BLD-Framing/Rough-in4/11/20124/11/20124/12/2012PPART
DetailsDave Hannah
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon all looks goog
BLD-Final4/11/20124/11/20124/11/2012PCANC
DetailsDave Hannah
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Framing/Rough-in4/5/20124/6/20124/6/2012APART
DetailsDave Hannah
Dave, I need this as early as possible.

Thanks, Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to insulate first floor common area
BLD-Framing/Rough-in4/5/20124/5/20124/5/2012PPART
DetailsDave Hannah
We need an inspection for the Community room. Phone #: ###-#### >> Inspection requested via web by Gary Simon 1hr ceiling ok
BLD-Framing/Rough-in3/28/20123/28/20123/28/2012PPART
DetailsDave Hannah
Dave, I am a little unsure were we are at on the 3rd floor west wing. I thought we were approved to cover but we will look at it just in case. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover secon and third floor south wing rooms and corridor
BLD-Energy code compliance3/14/20123/15/20123/16/2012APASS
DetailsDave Hannah
Dave, late morning if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference3/13/20123/14/20123/14/2012APART
DetailsDave Hannah
Dave, if mid-morning Phone #: ###-#### >> Inspection requested via web by Gary Simon int side of two sided shear walls first floor north half ok to cover
BLD-Framing/Rough-in3/13/20123/13/20123/14/2012PPART
DetailsDave Hannah
Dave, I need you to look at some shear walls we missed. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Framing/Rough-in3/5/20123/5/20123/6/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### ok to cover second floor both ends ok to insulate third floor walls and ceiling
BLD-Framing/Rough-in2/27/20122/27/20122/27/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### ok to insulate second floorsouth end
BLD-Framing/Rough-in2/22/20122/23/20122/24/2012APART
DetailsDave Hannah
gary Phone #: ###-#### second floor south end ok to insulate ext wall and ceiling of corridor
BLD-Framing/Rough-in2/21/20122/21/20122/21/2012PPART
DetailsDave Hannah
Gary ###-#### second floor south half needs more work finashed
BLD-Other2/17/20122/17/20122/17/2012PPART
DetailsJim Storey
Gary per Gary this inspection has nothing to do with the plan mod... Phone #: ###-#### 2nd floor duct fire blk at fur out ok east wing.
BLD-Framing/Rough-in2/13/20122/13/20122/14/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### if possible please make it later. per gary this has nothing to do with the plan mod. first floor north half romms ok to cover walls
BLD-Framing/Rough-in2/8/20122/9/20122/9/2012ANR
DetailsDave Hannah
Gary-- ###-####
BLD-Other2/6/20122/6/20122/9/2012PPEND
DetailsDave Hannah
gary - fire wall Phone #: ###-#### this is on kitchen range ducts need to talk with engineer and dan
BLD-Other1/26/20121/27/20121/27/2012APART
DetailsDave Hannah
Fire wall --- Gary ###-#### lids in piping chases ok to finish
BLD-Conference1/25/20121/25/20121/27/2012PPASS
DetailsDave Hannah
Please call prior to get other sub out on site in time -- Gary ###-####
BLD-Other1/17/20121/17/20121/19/2012PPASS
DetailsDave Hannah
gary - rough nailing Phone #: ###-####
BLD-Other1/13/20121/13/20121/13/2012PPASS
DetailsTom Arcoraci
rough shear nailing//Gary Phone #: ###-####
BLD-Other1/12/20121/13/20121/13/2012APART
DetailsMike Jordan
gary - rough shear nailing Phone #: ###-####. Roof shear nailing from gridline 20 west to edge of building between grids A to E. Nailing ok, work in progress on installing straps.
BLD-Other1/6/20121/9/20121/10/2012APART
DetailsDave Hannah
gary - fire proofing Phone #: ###-#### frist and second floor corradors north wing ok
BLD-Framing/Rough-in1/5/20121/6/20121/6/2012PPART
DetailsDave Hannah
gary - early as possible please Phone #: ###-#### int shear ho;d downs floor to floor ok on north half
BLD-Other1/4/20121/5/20121/5/2012APART
DetailsDave Hannah
shear wall insp//Gary Phone #: ###-#### sheetrock on fire wall west end second floor ok
BLD-Other12/29/201112/30/201112/30/2011APASS
DetailsDave Hannah
rich - shear wall Phone #: ###-####rest of the bldg ok to cover but need to check strapes
BLD-Conference12/27/201112/27/201112/29/2011PPART
DetailsDave Hannah
Please call prior so meeting can be set up---Gary ###-#### talked about shafts
BLD-Other12/22/201112/22/201112/23/2011PPART
DetailsDave Hannah
gary - ###-#### - shear wall sheetrock on third floor south wall ok to cover
BLD-Other12/20/201112/21/201112/22/2011PPART
DetailsDave Hannah
Early as possible///Shear nailing---Gary ###-#### second floor south wall ok to sheetrock also corrador lids first and second floor north side
BLD-Other12/19/201112/20/201112/20/2011APART
DetailsDave Hannah
shear wall//Gary Phone #: ###-#### see on site plans for location
BLD-Framing/Rough-in12/13/201112/14/201112/15/2011PPART
DetailsDave Hannah
early pm please///Gary Phone #: ###-#### looked at roof nailing
BLD-Conference12/9/201112/12/201112/12/2011PPASS
DetailsDave Hannah
Gary Phone #: ###-####
BLD-Framing/Rough-in12/6/201112/7/201112/7/2011APART
DetailsDave Hannah
Sheer nailing inspection///Gary ###-#### roof nailing east section
BLD-Other11/29/201111/29/201111/29/2011PPART
DetailsDave Hannah
shear wall insp...Gary Phone #: ###-#### third floor north half ok to cover ext
BLD-Other11/9/201111/9/201111/9/2011PPART
DetailsDave Hannah
###-#### - gary - shear nailing inspection first floor and second floor and conc deck first section ok
BLD-Other10/31/201110/31/201110/31/2011APART
DetailsDave Hannah
mike - ###-#### - - parking garage inspection slab on grade spec inspection will be on site @ 7:00 am pour
BLD-Other10/7/201110/10/201110/11/2011ACANC
DetailsDave Hannah
Rebar/special inspection by strata-- Gary ###-####
BLD-Concrete10/10/201110/11/201110/11/2011APASS
DetailsDave Hannah
gary - ###-#### - masonary - special inspection by Strata
BLD-Concrete10/7/201110/7/201110/7/2011PPART
DetailsJim Storey
Special inspecial inspection by Strata-re-bar inspection-Gary Phone #: ###-#### si pending report
BLD-Other10/3/201110/4/201110/4/2011APART
DetailsDave Hannah
Rebar---Gary ###-#### second level of cmu grouting ok to grout
BLD-Other9/28/20119/29/20119/30/2011APART
DetailsDave Hannah
gary - ###-#### - masonary -special inspection will take place first lift cmu ok
BLD-Conference9/16/20119/20/20119/22/2011PPASS
DetailsDave Hannah
Inspection for slab rebar and vapor barrier. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete9/12/20119/15/20119/15/2011PPASS
DetailsJim Storey
We will be placing concrete for a portion of the slab on Friday. morning. We have the rebar mat and the vapor barrior in place. Phone #: ###-#### >> Inspection requested via web by Gary Simon nw slab ok
BLD-Footing9/14/20119/15/20119/15/2011APASS
DetailsJim Storey
We are placing concrete for the column footings in the garage area. Strata will be onsite for rebar inspetion and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon placed w/si
BLD-Other9/12/20119/12/20119/13/2011PPASS
DetailsDave Hannah
We need a inspection on the vapor barrier for our 1st slab pour. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation9/1/20119/6/20119/12/2011PPART
DetailsDave Hannah
We are finishing up the remainder of the stemwalls. Strata will be onsite for the special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/30/20118/31/20119/1/2011PDEFR
DetailsDave Hannah
Placing concrete for ftgs. (1:00pm) Strata to be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/29/20118/30/20118/31/2011APART
DetailsDave Hannah
We are pouring footing tomorrow 9:00am Strata will be doing special inspections & Concrete cylinders

MB >> Inspection requested via web by Mike Burden
BLD-Footing8/23/20118/23/20118/24/2011APART
DetailsDave Hannah
Placing concrete in interior footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/23/20118/24/20118/24/2011APART
DetailsDave Hannah
We are placing concrete for interior footings. Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation8/23/20118/24/20118/24/2011PPART
DetailsDave Hannah
Stemwall pour at 1:00pm Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation8/19/20118/22/20118/23/2011PPART
DetailsDave Hannah
Pouring stemwalls and footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/18/20118/19/20118/23/2011APART
DetailsDave Hannah
We are pouring footings at 10:00 am Strata will be doing special inspection and taking concrete cylinders Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Foundation8/17/20118/18/20118/19/2011PPASS
DetailsDave Hannah
Placing concrete for foundation and ftgs. Strata will do special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/16/20118/17/20118/18/2011PPART
DetailsDave Hannah
We are pouring misc. footings and stemwalls at 1:00pm. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference8/15/20118/16/20118/18/2011PPART
DetailsDave Hannah
We are pouring footings tomorrow at 12:00 noon Strata will do special inspections and take cylinders

Thanks MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/12/20118/15/20118/16/2011APASS
DetailsDave Hannah
We are pouring walls at 10:00 am Strata will be doing Special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/10/20118/12/20118/16/2011APASS
DetailsDave Hannah
We are going to pour walls at elevator and main building 9:00am. Strata will do special inspections and cylinders

MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/9/20118/10/20118/10/2011PPART
DetailsDave Hannah
We are pouring 2ea elevator bases tomorrow at 1:00
Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/8/20118/9/20118/9/2011PDEFR
DetailsDave Hannah
We are pouring additional walls at 1:00 Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Footing8/3/20118/4/20118/4/2011APART
DetailsTony Young
We are placing concrete at 9:00am. Strata will be onsite for a special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon,,, pending special inspection report