BLD-Final | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
FIRE-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 | P | PASS |
Forrest France
|
|
|
|
FIRE-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 | P | CANC |
Troy Cobbley
|
|
|
Overbooked due to inspection load. Contractor notified.
|
FIRE-Final Inspection | 7/11/2012 | 7/13/2012 | 7/13/2012 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
FIRE-Final Inspection | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | NR |
Forrest France
|
|
|
Gary ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Wall cover | 6/7/2012 | 6/7/2012 | 6/7/2012 | P | PASS |
Dave Hannah
|
|
|
Dave, you are going to be looking at the rockwool at the last window. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/23/2012 | 5/24/2012 | 5/25/2012 | A | PASS |
Dave Hannah
|
|
|
Dave, this is the rockwool at the 2nd and 3rd floors. As early as possible Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/22/2012 | 5/22/2012 | 5/24/2012 | P | PASS |
Dave Hannah
|
|
|
Cover - ceilings Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/22/2012 | 5/23/2012 | 5/23/2012 | P | PASS |
Dave Hannah
|
|
|
Ceiling cover in the garage. Early pm if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 5/15/2012 | 5/15/2012 | 5/15/2012 | P | PASS |
Mike Jordan
|
|
|
Soffit cover 1st floor. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
FIRE-Sprinkler Rough-in | 5/14/2012 | 5/14/2012 | 5/14/2012 | P | PART |
Forrest France
|
|
|
Fire sprinkler work at the 1st floor common area soffits okayed for cover.
|
BLD-Other | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PART |
Mike Jordan
|
|
|
Soffit inspection 1st floor Phone #: ###-#### >> Inspection requested via web by Gary Simon. North and south portions, coridor area not ready. All fire stop and column encasement ok at soffit.
|
BLD-Other | 5/2/2012 | 5/3/2012 | 5/4/2012 | P | PASS |
Dave Hannah
|
|
|
Ceiling cover of soffits. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover soffits third floor west side
|
BLD-Framing/Rough-in | 4/26/2012 | 4/27/2012 | 4/27/2012 | A | PART |
Dave Hannah
|
|
|
Dave, we are inspecting the garage ceiling. Phone #: ###-#### >> Inspection requested via web by Gary Simon east third ok to cover
|
BLD-Energy code compliance | 4/17/2012 | 4/18/2012 | 4/20/2012 | A | PASS |
Dave Hannah
|
|
|
Dave, I need you to look at one more exterior wall. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover ceiling in north stair tower sheet rocking go good and insulation also ok
|
BLD-Framing/Rough-in | 4/11/2012 | 4/11/2012 | 4/12/2012 | P | PART |
Dave Hannah
|
|
|
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon all looks goog
|
BLD-Final | 4/11/2012 | 4/11/2012 | 4/11/2012 | P | CANC |
Dave Hannah
|
|
|
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Framing/Rough-in | 4/5/2012 | 4/6/2012 | 4/6/2012 | A | PART |
Dave Hannah
|
|
|
Dave, I need this as early as possible.
Thanks, Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to insulate first floor common area
|
BLD-Framing/Rough-in | 4/5/2012 | 4/5/2012 | 4/5/2012 | P | PART |
Dave Hannah
|
|
|
We need an inspection for the Community room. Phone #: ###-#### >> Inspection requested via web by Gary Simon 1hr ceiling ok
|
BLD-Framing/Rough-in | 3/28/2012 | 3/28/2012 | 3/28/2012 | P | PART |
Dave Hannah
|
|
|
Dave, I am a little unsure were we are at on the 3rd floor west wing. I thought we were approved to cover but we will look at it just in case. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover secon and third floor south wing rooms and corridor
|
BLD-Energy code compliance | 3/14/2012 | 3/15/2012 | 3/16/2012 | A | PASS |
Dave Hannah
|
|
|
Dave, late morning if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Conference | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | PART |
Dave Hannah
|
|
|
Dave, if mid-morning Phone #: ###-#### >> Inspection requested via web by Gary Simon int side of two sided shear walls first floor north half ok to cover
|
BLD-Framing/Rough-in | 3/13/2012 | 3/13/2012 | 3/14/2012 | P | PART |
Dave Hannah
|
|
|
Dave, I need you to look at some shear walls we missed. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Framing/Rough-in | 3/5/2012 | 3/5/2012 | 3/6/2012 | P | PART |
Dave Hannah
|
|
|
gary Phone #: ###-#### ok to cover second floor both ends ok to insulate third floor walls and ceiling
|
BLD-Framing/Rough-in | 2/27/2012 | 2/27/2012 | 2/27/2012 | P | PART |
Dave Hannah
|
|
|
gary Phone #: ###-#### ok to insulate second floorsouth end
|
BLD-Framing/Rough-in | 2/22/2012 | 2/23/2012 | 2/24/2012 | A | PART |
Dave Hannah
|
|
|
gary Phone #: ###-#### second floor south end ok to insulate ext wall and ceiling of corridor
|
BLD-Framing/Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | PART |
Dave Hannah
|
|
|
Gary ###-#### second floor south half needs more work finashed
|
BLD-Other | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | PART |
Jim Storey
|
|
|
Gary per Gary this inspection has nothing to do with the plan mod... Phone #: ###-#### 2nd floor duct fire blk at fur out ok east wing.
|
BLD-Framing/Rough-in | 2/13/2012 | 2/13/2012 | 2/14/2012 | P | PART |
Dave Hannah
|
|
|
gary Phone #: ###-#### if possible please make it later. per gary this has nothing to do with the plan mod. first floor north half romms ok to cover walls
|
BLD-Framing/Rough-in | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | NR |
Dave Hannah
|
|
|
Gary-- ###-####
|
BLD-Other | 2/6/2012 | 2/6/2012 | 2/9/2012 | P | PEND |
Dave Hannah
|
|
|
gary - fire wall Phone #: ###-#### this is on kitchen range ducts need to talk with engineer and dan
|
BLD-Other | 1/26/2012 | 1/27/2012 | 1/27/2012 | A | PART |
Dave Hannah
|
|
|
Fire wall --- Gary ###-#### lids in piping chases ok to finish
|
BLD-Conference | 1/25/2012 | 1/25/2012 | 1/27/2012 | P | PASS |
Dave Hannah
|
|
|
Please call prior to get other sub out on site in time -- Gary ###-####
|
BLD-Other | 1/17/2012 | 1/17/2012 | 1/19/2012 | P | PASS |
Dave Hannah
|
|
|
gary - rough nailing Phone #: ###-####
|
BLD-Other | 1/13/2012 | 1/13/2012 | 1/13/2012 | P | PASS |
Tom Arcoraci
|
|
|
rough shear nailing//Gary Phone #: ###-####
|
BLD-Other | 1/12/2012 | 1/13/2012 | 1/13/2012 | A | PART |
Mike Jordan
|
|
|
gary - rough shear nailing Phone #: ###-####. Roof shear nailing from gridline 20 west to edge of building between grids A to E. Nailing ok, work in progress on installing straps.
|
BLD-Other | 1/6/2012 | 1/9/2012 | 1/10/2012 | A | PART |
Dave Hannah
|
|
|
gary - fire proofing Phone #: ###-#### frist and second floor corradors north wing ok
|
BLD-Framing/Rough-in | 1/5/2012 | 1/6/2012 | 1/6/2012 | P | PART |
Dave Hannah
|
|
|
gary - early as possible please Phone #: ###-#### int shear ho;d downs floor to floor ok on north half
|
BLD-Other | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PART |
Dave Hannah
|
|
|
shear wall insp//Gary Phone #: ###-#### sheetrock on fire wall west end second floor ok
|
BLD-Other | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | PASS |
Dave Hannah
|
|
|
rich - shear wall Phone #: ###-####rest of the bldg ok to cover but need to check strapes
|
BLD-Conference | 12/27/2011 | 12/27/2011 | 12/29/2011 | P | PART |
Dave Hannah
|
|
|
Please call prior so meeting can be set up---Gary ###-#### talked about shafts
|
BLD-Other | 12/22/2011 | 12/22/2011 | 12/23/2011 | P | PART |
Dave Hannah
|
|
|
gary - ###-#### - shear wall sheetrock on third floor south wall ok to cover
|
BLD-Other | 12/20/2011 | 12/21/2011 | 12/22/2011 | P | PART |
Dave Hannah
|
|
|
Early as possible///Shear nailing---Gary ###-#### second floor south wall ok to sheetrock also corrador lids first and second floor north side
|
BLD-Other | 12/19/2011 | 12/20/2011 | 12/20/2011 | A | PART |
Dave Hannah
|
|
|
shear wall//Gary Phone #: ###-#### see on site plans for location
|
BLD-Framing/Rough-in | 12/13/2011 | 12/14/2011 | 12/15/2011 | P | PART |
Dave Hannah
|
|
|
early pm please///Gary Phone #: ###-#### looked at roof nailing
|
BLD-Conference | 12/9/2011 | 12/12/2011 | 12/12/2011 | P | PASS |
Dave Hannah
|
|
|
Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2011 | 12/7/2011 | 12/7/2011 | A | PART |
Dave Hannah
|
|
|
Sheer nailing inspection///Gary ###-#### roof nailing east section
|
BLD-Other | 11/29/2011 | 11/29/2011 | 11/29/2011 | P | PART |
Dave Hannah
|
|
|
shear wall insp...Gary Phone #: ###-#### third floor north half ok to cover ext
|
BLD-Other | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | PART |
Dave Hannah
|
|
|
###-#### - gary - shear nailing inspection first floor and second floor and conc deck first section ok
|
BLD-Other | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | PART |
Dave Hannah
|
|
|
mike - ###-#### - - parking garage inspection slab on grade spec inspection will be on site @ 7:00 am pour
|
BLD-Other | 10/7/2011 | 10/10/2011 | 10/11/2011 | A | CANC |
Dave Hannah
|
|
|
Rebar/special inspection by strata-- Gary ###-####
|
BLD-Concrete | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | PASS |
Dave Hannah
|
|
|
gary - ###-#### - masonary - special inspection by Strata
|
BLD-Concrete | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PART |
Jim Storey
|
|
|
Special inspecial inspection by Strata-re-bar inspection-Gary Phone #: ###-#### si pending report
|
BLD-Other | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PART |
Dave Hannah
|
|
|
Rebar---Gary ###-#### second level of cmu grouting ok to grout
|
BLD-Other | 9/28/2011 | 9/29/2011 | 9/30/2011 | A | PART |
Dave Hannah
|
|
|
gary - ###-#### - masonary -special inspection will take place first lift cmu ok
|
BLD-Conference | 9/16/2011 | 9/20/2011 | 9/22/2011 | P | PASS |
Dave Hannah
|
|
|
Inspection for slab rebar and vapor barrier. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 9/12/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Jim Storey
|
|
|
We will be placing concrete for a portion of the slab on Friday. morning. We have the rebar mat and the vapor barrior in place. Phone #: ###-#### >> Inspection requested via web by Gary Simon nw slab ok
|
BLD-Footing | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | PASS |
Jim Storey
|
|
|
We are placing concrete for the column footings in the garage area. Strata will be onsite for rebar inspetion and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon placed w/si
|
BLD-Other | 9/12/2011 | 9/12/2011 | 9/13/2011 | P | PASS |
Dave Hannah
|
|
|
We need a inspection on the vapor barrier for our 1st slab pour. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Foundation | 9/1/2011 | 9/6/2011 | 9/12/2011 | P | PART |
Dave Hannah
|
|
|
We are finishing up the remainder of the stemwalls. Strata will be onsite for the special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/30/2011 | 8/31/2011 | 9/1/2011 | P | DEFR |
Dave Hannah
|
|
|
Placing concrete for ftgs. (1:00pm) Strata to be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/29/2011 | 8/30/2011 | 8/31/2011 | A | PART |
Dave Hannah
|
|
|
We are pouring footing tomorrow 9:00am Strata will be doing special inspections & Concrete cylinders
MB >> Inspection requested via web by Mike Burden
|
BLD-Footing | 8/23/2011 | 8/23/2011 | 8/24/2011 | A | PART |
Dave Hannah
|
|
|
Placing concrete in interior footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | PART |
Dave Hannah
|
|
|
We are placing concrete for interior footings. Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Foundation | 8/23/2011 | 8/24/2011 | 8/24/2011 | P | PART |
Dave Hannah
|
|
|
Stemwall pour at 1:00pm Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Foundation | 8/19/2011 | 8/22/2011 | 8/23/2011 | P | PART |
Dave Hannah
|
|
|
Pouring stemwalls and footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/18/2011 | 8/19/2011 | 8/23/2011 | A | PART |
Dave Hannah
|
|
|
We are pouring footings at 10:00 am Strata will be doing special inspection and taking concrete cylinders Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Foundation | 8/17/2011 | 8/18/2011 | 8/19/2011 | P | PASS |
Dave Hannah
|
|
|
Placing concrete for foundation and ftgs. Strata will do special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/16/2011 | 8/17/2011 | 8/18/2011 | P | PART |
Dave Hannah
|
|
|
We are pouring misc. footings and stemwalls at 1:00pm. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Conference | 8/15/2011 | 8/16/2011 | 8/18/2011 | P | PART |
Dave Hannah
|
|
|
We are pouring footings tomorrow at 12:00 noon Strata will do special inspections and take cylinders
Thanks MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Conference | 8/12/2011 | 8/15/2011 | 8/16/2011 | A | PASS |
Dave Hannah
|
|
|
We are pouring walls at 10:00 am Strata will be doing Special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Conference | 8/10/2011 | 8/12/2011 | 8/16/2011 | A | PASS |
Dave Hannah
|
|
|
We are going to pour walls at elevator and main building 9:00am. Strata will do special inspections and cylinders
MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Conference | 8/9/2011 | 8/10/2011 | 8/10/2011 | P | PART |
Dave Hannah
|
|
|
We are pouring 2ea elevator bases tomorrow at 1:00 Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Conference | 8/8/2011 | 8/9/2011 | 8/9/2011 | P | DEFR |
Dave Hannah
|
|
|
We are pouring additional walls at 1:00 Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
BLD-Footing | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PART |
Tony Young
|
|
|
We are placing concrete at 9:00am. Strata will be onsite for a special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon,,, pending special inspection report
|