BLD-Final | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | PASS |
Mike Jordan
|
|
|
Second times a charm. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 1/18/2012 | 1/18/2012 | 1/18/2012 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was issued.
|
DOC - Permit Finaled | 1/18/2012 | 1/18/2012 | 1/18/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/17/2012 | 1/17/2012 | 1/17/2012 | P | NR |
Mike Jordan
|
|
|
Please call for access. Thx. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 7/14/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 7/14/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
Reinspection on framing. Energy Code Inspection at same time??? ; - ) Thanks! Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 7/13/2011 | 7/14/2011 | 7/14/2011 | P | FAIL |
Mike Jordan
|
|
|
Plans on site above fireplace. Thanks! Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Complte fireblocking at upstairs bathroom, complete airseal package fur out knee walls at vaukted ceiling at main entry for energy. ok to vinsulate. Correction notice issued.
|
BLD-Energy code compliance | 7/13/2011 | 7/14/2011 | 7/13/2011 | A | CANC |
Mike Jordan
|
|
|
Thanks! Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Other | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Mike Jordan
|
|
|
Inspection of firewall insulation and fire stops. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Other | 6/14/2011 | 6/15/2011 | 6/15/2011 | P | PASS |
Mike Jordan
|
|
|
Need inspection on parapet at overframes prior to roof sheathing. Had meeting prior at our office, want to review prior to cover. Thanks Scott (Framer on site) Phone #: ###-#### >> Inspection requested via web by Scott Zierler. $ft. laydown parapet.
|
BLD-Wall cover | 5/31/2011 | 5/31/2011 | 5/31/2011 | P | PART |
Mike Jordan
|
|
|
Inspection for Gyp Bd. Shear Wall installation at firewall. Have been speaking with Perry Paine about this installation. Please see framer on site to inspect. Thanks Phone #: ###-#### >> Inspection requested via web by Scott Zierler. BAse layer only ok.
|
BLD-Wall cover | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | CANC |
Mike Jordan
|
|
|
Inspection of fire wall as it relates to Gypsum Board Shear Wall. 7" inches OC spacing. Spoke with Perry Paine. Thanks, Scott. Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Footing | 5/11/2011 | 5/11/2011 | 5/11/2011 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|