Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-00298
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD
Project Name9thFLOOR RESTROOM REMODEL
Customer Number 
ePlanReviewNo
Description
(US BANK - Shell and Core – 9th Floor) Permit is to upgrade the restrooms on the 9th floor. Approval contingent upon adhering to the approved plans on file and replacing sprinkler heads in the bathroom and lobby with quick responce heads. Work to include: installation of new accessible bathroom fixtures, [demolition of existing restrooms], and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection5/26/20115/27/20115/27/2011APASS
DetailsForrest France
Fire life safety completed satisfactory. Inspection passed.
BLD-Final5/26/20115/27/20115/27/2011APASS
DetailsJim Sly
Sam-Please call at least 30 mins prior to inspection Phone #: ###-####
DOC - Permit Finaled5/27/20115/27/20115/27/2011PPASS
DetailsJim Sly
FIRE-Final Inspection5/25/20115/25/20115/25/2011APASS
DetailsForrest France
Fire life safety okay for final when fire sprinkler permit is passed.
FIRE-Final Inspection5/18/20115/19/20115/19/2011APART
DetailsForrest France
Fire life safety pending related fire sprinkler permit final. Notification test at the restrooms okayed.
FIRE-Final Inspection5/18/20115/18/20115/18/2011PPART
DetailsForrest France
FIRE-Conference3/30/20113/30/20113/30/2011PDONE
DetailsForrest France
Regarding fire sprinkler coverage at the electrical closet.
BLD-Framing/Rough-in3/29/20113/29/20113/30/2011PPASS
DetailsDave Hannah
duane Phone #: ###-#### ok to cover 9th floor restrooms
FIRE-Final Inspection3/29/20113/29/20113/29/2011PNR
DetailsForrest France