Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-00299
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD
Project NameUS BANK BLDG - 11TH FLOOR
Customer Number 
ePlanReviewNo
Description
(US BANK - Shell and Core – 11th Floor) Permit is to upgrade the restrooms on the 11th floor. Approval contingent upon adhering to the approved plans on file and the replacing of all sprinkler heads in the restroom and lobby areas with quick response heads. Work to include: installation of new accessible bathroom fixtures, [demolition of existing restrooms], and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/26/20115/27/20115/27/2011APASS
DetailsJim Sly
Sam-Please call at least 30 mins prior to inspection Phone #: ###-####
DOC - Permit Finaled5/27/20115/27/20115/27/2011PPASS
DetailsJim Sly
BLD-Final5/18/20115/19/20115/20/2011PFAIL
DetailsDave Hannah
Sam Phone #: ###-#### water closits mor than 18 inches from wall
BLD-Final5/16/20115/17/20115/18/2011PCANC
DetailsDave Hannah
duane please call before going out Phone #: ###-####
FIRE-Final Inspection5/16/20115/17/20115/17/2011APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Framing/Rough-in3/24/20113/25/20113/25/2011APART
DetailsDave Hannah
Duane please call before going out or call ###-#### Phone #: ###-#### 11th floor restrooms ok to cover walls