Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00307
StatusFinaled
Name RAFANELLI & NAHAS
Site Address 408 E PARKCENTER BLVD Unit: 200
Project NameRiver Quarry Bldg B
Customer Number 
ePlanReviewNo
Description
(APEX - River Quarry Bldg "B" - Ste#200) Permit is to separate off a 3,683 square foot area off an existing 16,171 square foot 2nd floor tenant space for a new tenant. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create a new office, a new copy room, a new server room, a new breakroom, and to separate this space from the remainder], infill existing door openings, create new door openings, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20115/10/20115/10/2011APASS
DetailsJim Storey
Justin please call 30 min before going out Phone #: ###-####
BLD-Final4/19/20114/21/20114/21/2011APASS
DetailsJim Storey
justin Phone #: ###-#### temp occ pending ele and saftey glass at break rm
FIRE-Final Inspection4/19/20114/20/20114/20/2011APASS
DetailsForrest France
Fire life safety completed satisfactory.
FIRE-Conference4/18/20114/18/20114/18/2011ADONE
DetailsForrest France
Regarding project completion schedule and case related fire sprinkler permit work.
FIRE-Sprinkler Rough-in4/14/20114/14/20114/14/2011PPART
DetailsForrest France
OH work okay to cover. Discussed project completion for tenant and vanilla building permits.
BLD-Framing/Rough-in4/5/20114/6/20114/7/2011PPASS
DetailsDave Hannah
justin - ceiling inspection - please call 1/2 hr prior Phone #: ###-#### ok to flood ceiling
BLD-Framing/Rough-in3/16/20113/16/20113/16/2011PPASS
DetailsJim Storey
justin Phone #: ###-####