BLD-Final | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/24/2011 | 6/24/2011 | 6/24/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was issued.
|
BLD-Final | 6/23/2011 | 6/23/2011 | 6/23/2011 | P | FAIL |
Mike Jordan
|
|
|
Brett Phone #: ###-####. Neesd to provide the airchanges per hour on blower door test results that have been posted.
|
BLD-Energy code compliance | 5/18/2011 | 5/19/2011 | 5/19/2011 | A | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2011 | 5/19/2011 | 5/19/2011 | A | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####. FRaming issues were resolved.
|
BLD-Framing/Rough-in | 5/17/2011 | 5/17/2011 | 5/17/2011 | P | FAIL |
Mike Jordan
|
|
|
Brett ###-####. Provide (2) 2x8 headers over main door, Foam seal edges at concealed space. ok to insulate. Correction notice posted.
|
BLD-Foundation | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PART |
Mike Jordan
|
|
|
Wesley Phone #: ###-####
|
BLD-Footing | 4/28/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|