BLD-Final | 12/8/2011 | 12/9/2011 | 12/9/2011 | A | PASS |
Dave Hannah
|
|
|
bryan - please all 1/2 hr prior so he can meet you there Phone #: ###-####
|
DOC - Permit Finaled | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 12/8/2011 | 12/8/2011 | 12/8/2011 | P | DONE |
Terry Records
|
|
|
final grading and drainage approved
|
BLD-Final | 11/21/2011 | 11/22/2011 | 11/22/2011 | P | FAIL |
Dave Hannah
|
|
|
Brian Phone #: ###-#### needs gaurd rail back patio enrgey cert hill side final
|
BLD-Energy code compliance | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-#### talked with Bryan told him it was ok to cover after fire ok for cover
|
BLD-Framing/Rough-in | 9/2/2011 | 9/2/2011 | 9/2/2011 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | NR |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2011 | 8/31/2011 | 9/1/2011 | P | FAIL |
Dave Hannah
|
|
|
bryan Phone #: ###-#### c/n on site
|
BLD-Foundation | 8/3/2011 | 8/3/2011 | 8/3/2011 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-#### retanning wall by driveway ok to pour
|
BLD-Footing | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PART |
Dave Hannah
|
|
|
eric Phone #: ###-#### retaining wall ftg by driveway ok to pour
|
BLD-Foundation | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Dave Hannah
|
|
|
Late afternoon-- Erik Phone #: ###-####
|
BLD-Footing | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|