Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-00939
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC15141
ePlanReviewNo
Description
Micron Buildings 24D & 24E - (C15141) - Remodel For Clean and Dirty Links - To convert approximately 1,900 sq. ft. of clean link, dirty corridor, and dock space in Building 24D into a clean link to future Building 50. Install new cleanroom ceiling grid with HEPAS to prepare for installation of AMHS extension to Building 50. Remodel approximately 1,200 sq. ft. of Lab space in Building 24E to accomodate a new dirty corridor to Building 50. Install new catwalks in the interstial spaces of Buildings 24D & 24E to accomidate facility routing in the area. This work is being done on the first floor of Buildings 24D & 24E between grid lines A&F and 30&33. This permit also includes related electrical and mechanical work. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/7/201212/10/201212/10/2012APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
DOC - Permit Finaled12/10/201212/10/201212/10/2012PPASS
DetailsJim Storey
FIRE-Final Inspection12/5/201212/6/201212/7/2012APASS
DetailsForrest France
BLD-Final12/5/201212/6/201212/7/2012ADEFR
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
FIRE-Final Inspection10/29/201210/30/201210/30/2012ACANC
DetailsForrest France
Meet in B25 at Paul''s office Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Final10/29/201210/30/201210/30/2012ADEFR
DetailsJim Storey
Meet in B25 at Paul''s office. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes conf. to recall for final.
FIRE-Final Inspection9/10/20129/12/20129/14/2012APEND
DetailsForrest France
Final pending door install, panel at clean link, exiting at the mechanical level.
FIRE-Final Inspection9/4/20129/6/20129/5/2012ACANC
DetailsForrest France
Meet in B25, please call when in route to the Micron site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Final8/15/20128/16/20128/16/2012PCANC
DetailsJim Storey
smoke seal, hand rails have been installed. after lunch works best but please call anytime if you are close to the site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkessmoke seal and handrail ok
BLD-Final8/1/20128/2/20128/2/2012APART
DetailsJim Storey
meet in 25 at Greg''s cube. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes revise plan to reflect fire wall configuration// handrails/ smoke seal
BLD-Conference8/1/20128/1/20128/1/2012PCANC
DetailsJim Storey
smoke seals/ door glazing/ firestopping se beam/threshold max 3/4 ne door top// panic hardware ele rms exterior/ no storage in stair enclosers/ plan fire wall mod.
BLD-Conference5/21/20125/22/20125/22/2012APASS
DetailsJim Storey
look at exterior door B24E. Call for meeting place. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 1 1/2 hr door at exterior wall ok
BLD-Conference4/6/20124/6/20124/6/2012PPASS
DetailsJim Storey
review the firewall doors and exit paths 24D & E Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference2/29/20123/1/20123/1/2012APEND
DetailsJim Storey
deluge drain thru firewall Phone #: ###-#### >> Inspection requested via web by Greg Kirkes unabe to access area for insp. at 50 link/24 will be resch. for insp.
BLD-Wall cover2/29/20122/29/20123/1/2012PPASS
DetailsJim Storey
pipe drain for dayluse pan penatration of 24 d/e fire sepration firestopping collors inplace and aproved for cover at clean link.
BLD-Conference2/21/20122/22/20122/22/2012APASS
DetailsJim Storey
Call when in route for meeting on site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes all fire stopping of piping both sides of 3 hr wall at 24 and 50 link ok/ chem tray requiers support at fire wall link side.
BLD-Conference2/9/20122/9/20122/9/2012PPASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to instal third layer and fire stops on inert side of 3hr wall.
BLD-Conference2/7/20122/8/20122/8/2012APART
DetailsJim Storey
Call when in route. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes reviewed chem tray fire assembly missing intermant pudy at tubing/ insulated piping to be insulated and proper fire stop instaled.
BLD-Conference2/6/20122/6/20122/6/2012PPASS
DetailsJim Storey
inerts south opening ready on 1 side. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes wall assembly 50 side ok pending isues of penatration firestopping aplactions.
BLD-Conference2/2/20122/2/20122/2/2012PPASS
DetailsJim Storey
Call and meet when you get on site, we have some rock to look at today. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to rock out infil.
BLD-Conference1/30/20121/31/20121/31/2012PPASS
DetailsJim Storey
Call when headed this direction or if at B50. Bring your tan, while you still have it. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 3hr fire door acuation and listing ok/
BLD-Conference1/14/20121/17/20121/17/2012PCANC
DetailsJim Storey
call for where to meet around 2 or when you get time in the afternoon. rated ex joint will be ready. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes joint sealants aplied and meet listings for aplcation of 3hr fire wall.
BLD-Conference1/10/20121/10/20121/10/2012PPASS
DetailsJim Storey
double egress door in rated wall, attachment for cover. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference1/7/20121/9/20121/9/2012APASS
DetailsJim Storey
Inspect east rated joint at D/E split second coat complete, verify thickness and gas plate pillow compressions for cover. Call to verify where to meet. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference1/5/20121/5/20121/5/2012APART
DetailsJim Storey
FS 3000 material has arrived for the assembly. anytime after 10 AM this moring works well. meet in 25 or 24 either way. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes gas line fire assembly ok/ expantion joint assembly sealeant work in progress.
BLD-Conference1/4/20121/4/20121/4/2012PPASS
DetailsJim Storey
house vac and other north piping is ready for rated inspections. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes piping and membrane penatrations complet on 3hr wall assembly.
BLD-Wall cover12/29/201112/30/201112/30/2011APASS
DetailsJim Storey
link firewall above roof . parippet ok to roof at 24/50 link.
BLD-Conference12/27/201112/28/201112/28/2011PPASS
DetailsJim Storey
This also cover today''s inspection, the site would not let me access until after 12:30 PM today. Fire caulking at rated assembly inspections. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire wall joints packed with minrial wool per listing ok to apply fire seallant./ 3rd layer atchment approved.
BLD-Wall cover12/22/201112/23/201112/23/2011PPART
DetailsJim Storey
230 appt/ call al50 side n/r 24d ok to firestop and tape.
BLD-Conference12/16/201112/22/201112/22/2011ANR
DetailsJim Storey
Meet at firewall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Wall cover12/21/201112/21/201112/21/2011PPART
DetailsJim Storey
3rd layer of 3hr wall. progression ok
BLD-Conference12/16/201112/21/201112/21/2011APASS
DetailsJim Storey
Meet at firewall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference12/16/201112/20/201112/20/2011APASS
DetailsJim Storey
Meet at the fire wall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes first layer on bothsides of 3hr wall ok to cover. 24 d&e/bld 50
BLD-Conference12/16/201112/19/201112/19/2011APASS
DetailsJim Storey
Meet in 25 with Wayne first then the fire wall after Phone #: ###-#### >> Inspection requested via web by Greg Kirkesdoor fames and framing ok.
BLD-Conference12/7/201112/14/201112/14/2011APART
DetailsJim Storey
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference12/7/201112/13/201112/14/2011APART
DetailsJim Storey
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference12/9/201112/12/201112/13/2011PPART
DetailsJim Storey
Meet me in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference12/7/201112/12/201112/9/2011ACANC
DetailsJim Storey
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Conference12/7/201112/9/201112/9/2011APART
DetailsJim Storey
meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 1st layer top of wall ok to proceed at door jamb. need expantion joint details
BLD-Conference12/7/201112/8/201112/8/2011APART
DetailsJim Storey
meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes rated door assembly ok, upper level passage door.
BLD-Conference12/7/201112/8/201112/7/2011ACANC
DetailsJim Storey
meet in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Conference11/29/201111/30/201111/30/2011APASS
DetailsJim Storey
coffee up and head em out. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes final layer in stair tower bldg 24 north side of bld 50 link done.
BLD-Wall cover11/22/201111/22/201111/22/2011PPASS
DetailsJim Storey
Meet Mike Reyes B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to apply 3rd layer/
BLD-Conference11/16/201111/22/201111/22/2011ADEFR
DetailsJim Storey
Meet Mike Reyes B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference11/18/201111/21/201111/21/2011APART
DetailsJim Storey
Mike Reyes will cover for me this week as needed for the stairwell rated assembly. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes first layer and fire chalking complet 2nd layer progrestion lap spacing ok to continue. screw sch ok.
BLD-Conference11/17/201111/18/201111/18/2011PCANC
DetailsJim Storey
procurment delays, will update Friday as needed. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Conference11/16/201111/18/201111/17/2011ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Conference11/16/201111/17/201111/17/2011APASS
DetailsJim Storey
meet at Greg''s cube Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok for first layer of gyp on 3hr wall in stair tower north side of bld 50# link.
BLD-Framing/Rough-in11/4/201111/7/201111/7/2011APART
DetailsJim Storey
Look at inerts 3 hour assembly. Meet at gregs cube if there is time, can always push to Monday if today''s schedule is tight Phone #: ###-#### >> Inspection requested via web by Greg Kirkes building 24 side ok for membrane aplacation.
BLD-Conference11/4/201111/4/201111/7/2011PPART
DetailsJim Storey
Look at inerts 3 hour assembly. Meet at gregs cube if there is time, can always push to Monday if today''s schedule is tight Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference10/24/201110/24/201110/24/2011PPART
DetailsJim Storey
Meet at Greg''s cube. If your in the area anytime works for us. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference9/15/20119/20/20119/20/2011APASS
DetailsJim Storey
inspect gas plates.
Meet in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire protection instaled per listing ok.
BLD-Framing/Rough-in8/17/20118/18/20118/18/2011APART
DetailsJim Storey
reviewed fire assembly ok
BLD-Conference8/4/20118/4/20118/4/2011PPASS
DetailsJim Storey
Meet at the south side of the link which connects building 24D & 50. Inspect the fire rated gas plate. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire pillows instaled ok
BLD-Conference7/7/20117/11/20117/11/2011APART
DetailsJim Storey
Meet at Paul''s office. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Conference7/5/20117/7/20117/7/2011APART
DetailsJim Storey
Meet at Greg''s cube. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes reviewed aproved plan and will come back next week to address isues that were not refelected on plans.