BLD-Final | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
DOC - Permit Finaled | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/5/2012 | 12/6/2012 | 12/7/2012 | A | PASS |
Forrest France
|
|
|
|
BLD-Final | 12/5/2012 | 12/6/2012 | 12/7/2012 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
FIRE-Final Inspection | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | CANC |
Forrest France
|
|
|
Meet in B25 at Paul''s office Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Final | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | DEFR |
Jim Storey
|
|
|
Meet in B25 at Paul''s office. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes conf. to recall for final.
|
FIRE-Final Inspection | 9/10/2012 | 9/12/2012 | 9/14/2012 | A | PEND |
Forrest France
|
|
|
Final pending door install, panel at clean link, exiting at the mechanical level.
|
FIRE-Final Inspection | 9/4/2012 | 9/6/2012 | 9/5/2012 | A | CANC |
Forrest France
|
|
|
Meet in B25, please call when in route to the Micron site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Final | 8/15/2012 | 8/16/2012 | 8/16/2012 | P | CANC |
Jim Storey
|
|
|
smoke seal, hand rails have been installed. after lunch works best but please call anytime if you are close to the site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkessmoke seal and handrail ok
|
BLD-Final | 8/1/2012 | 8/2/2012 | 8/2/2012 | A | PART |
Jim Storey
|
|
|
meet in 25 at Greg''s cube. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes revise plan to reflect fire wall configuration// handrails/ smoke seal
|
BLD-Conference | 8/1/2012 | 8/1/2012 | 8/1/2012 | P | CANC |
Jim Storey
|
|
|
smoke seals/ door glazing/ firestopping se beam/threshold max 3/4 ne door top// panic hardware ele rms exterior/ no storage in stair enclosers/ plan fire wall mod.
|
BLD-Conference | 5/21/2012 | 5/22/2012 | 5/22/2012 | A | PASS |
Jim Storey
|
|
|
look at exterior door B24E. Call for meeting place. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 1 1/2 hr door at exterior wall ok
|
BLD-Conference | 4/6/2012 | 4/6/2012 | 4/6/2012 | P | PASS |
Jim Storey
|
|
|
review the firewall doors and exit paths 24D & E Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PEND |
Jim Storey
|
|
|
deluge drain thru firewall Phone #: ###-#### >> Inspection requested via web by Greg Kirkes unabe to access area for insp. at 50 link/24 will be resch. for insp.
|
BLD-Wall cover | 2/29/2012 | 2/29/2012 | 3/1/2012 | P | PASS |
Jim Storey
|
|
|
pipe drain for dayluse pan penatration of 24 d/e fire sepration firestopping collors inplace and aproved for cover at clean link.
|
BLD-Conference | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | PASS |
Jim Storey
|
|
|
Call when in route for meeting on site. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes all fire stopping of piping both sides of 3 hr wall at 24 and 50 link ok/ chem tray requiers support at fire wall link side.
|
BLD-Conference | 2/9/2012 | 2/9/2012 | 2/9/2012 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to instal third layer and fire stops on inert side of 3hr wall.
|
BLD-Conference | 2/7/2012 | 2/8/2012 | 2/8/2012 | A | PART |
Jim Storey
|
|
|
Call when in route. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes reviewed chem tray fire assembly missing intermant pudy at tubing/ insulated piping to be insulated and proper fire stop instaled.
|
BLD-Conference | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | PASS |
Jim Storey
|
|
|
inerts south opening ready on 1 side. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes wall assembly 50 side ok pending isues of penatration firestopping aplactions.
|
BLD-Conference | 2/2/2012 | 2/2/2012 | 2/2/2012 | P | PASS |
Jim Storey
|
|
|
Call and meet when you get on site, we have some rock to look at today. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to rock out infil.
|
BLD-Conference | 1/30/2012 | 1/31/2012 | 1/31/2012 | P | PASS |
Jim Storey
|
|
|
Call when headed this direction or if at B50. Bring your tan, while you still have it. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 3hr fire door acuation and listing ok/
|
BLD-Conference | 1/14/2012 | 1/17/2012 | 1/17/2012 | P | CANC |
Jim Storey
|
|
|
call for where to meet around 2 or when you get time in the afternoon. rated ex joint will be ready. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes joint sealants aplied and meet listings for aplcation of 3hr fire wall.
|
BLD-Conference | 1/10/2012 | 1/10/2012 | 1/10/2012 | P | PASS |
Jim Storey
|
|
|
double egress door in rated wall, attachment for cover. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 1/7/2012 | 1/9/2012 | 1/9/2012 | A | PASS |
Jim Storey
|
|
|
Inspect east rated joint at D/E split second coat complete, verify thickness and gas plate pillow compressions for cover. Call to verify where to meet. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 1/5/2012 | 1/5/2012 | 1/5/2012 | A | PART |
Jim Storey
|
|
|
FS 3000 material has arrived for the assembly. anytime after 10 AM this moring works well. meet in 25 or 24 either way. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes gas line fire assembly ok/ expantion joint assembly sealeant work in progress.
|
BLD-Conference | 1/4/2012 | 1/4/2012 | 1/4/2012 | P | PASS |
Jim Storey
|
|
|
house vac and other north piping is ready for rated inspections. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes piping and membrane penatrations complet on 3hr wall assembly.
|
BLD-Wall cover | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | PASS |
Jim Storey
|
|
|
link firewall above roof . parippet ok to roof at 24/50 link.
|
BLD-Conference | 12/27/2011 | 12/28/2011 | 12/28/2011 | P | PASS |
Jim Storey
|
|
|
This also cover today''s inspection, the site would not let me access until after 12:30 PM today. Fire caulking at rated assembly inspections. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire wall joints packed with minrial wool per listing ok to apply fire seallant./ 3rd layer atchment approved.
|
BLD-Wall cover | 12/22/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Jim Storey
|
|
|
230 appt/ call al50 side n/r 24d ok to firestop and tape.
|
BLD-Conference | 12/16/2011 | 12/22/2011 | 12/22/2011 | A | NR |
Jim Storey
|
|
|
Meet at firewall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Wall cover | 12/21/2011 | 12/21/2011 | 12/21/2011 | P | PART |
Jim Storey
|
|
|
3rd layer of 3hr wall. progression ok
|
BLD-Conference | 12/16/2011 | 12/21/2011 | 12/21/2011 | A | PASS |
Jim Storey
|
|
|
Meet at firewall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 12/16/2011 | 12/20/2011 | 12/20/2011 | A | PASS |
Jim Storey
|
|
|
Meet at the fire wall or B25 depending on your schedule. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes first layer on bothsides of 3hr wall ok to cover. 24 d&e/bld 50
|
BLD-Conference | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | PASS |
Jim Storey
|
|
|
Meet in 25 with Wayne first then the fire wall after Phone #: ###-#### >> Inspection requested via web by Greg Kirkesdoor fames and framing ok.
|
BLD-Conference | 12/7/2011 | 12/14/2011 | 12/14/2011 | A | PART |
Jim Storey
|
|
|
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 12/7/2011 | 12/13/2011 | 12/14/2011 | A | PART |
Jim Storey
|
|
|
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 12/9/2011 | 12/12/2011 | 12/13/2011 | P | PART |
Jim Storey
|
|
|
Meet me in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 12/7/2011 | 12/12/2011 | 12/9/2011 | A | CANC |
Jim Storey
|
|
|
Meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Conference | 12/7/2011 | 12/9/2011 | 12/9/2011 | A | PART |
Jim Storey
|
|
|
meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes 1st layer top of wall ok to proceed at door jamb. need expantion joint details
|
BLD-Conference | 12/7/2011 | 12/8/2011 | 12/8/2011 | A | PART |
Jim Storey
|
|
|
meet B25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes rated door assembly ok, upper level passage door.
|
BLD-Conference | 12/7/2011 | 12/8/2011 | 12/7/2011 | A | CANC |
Jim Storey
|
|
|
meet in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Conference | 11/29/2011 | 11/30/2011 | 11/30/2011 | A | PASS |
Jim Storey
|
|
|
coffee up and head em out. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes final layer in stair tower bldg 24 north side of bld 50 link done.
|
BLD-Wall cover | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PASS |
Jim Storey
|
|
|
Meet Mike Reyes B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok to apply 3rd layer/
|
BLD-Conference | 11/16/2011 | 11/22/2011 | 11/22/2011 | A | DEFR |
Jim Storey
|
|
|
Meet Mike Reyes B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 11/18/2011 | 11/21/2011 | 11/21/2011 | A | PART |
Jim Storey
|
|
|
Mike Reyes will cover for me this week as needed for the stairwell rated assembly. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes first layer and fire chalking complet 2nd layer progrestion lap spacing ok to continue. screw sch ok.
|
BLD-Conference | 11/17/2011 | 11/18/2011 | 11/18/2011 | P | CANC |
Jim Storey
|
|
|
procurment delays, will update Friday as needed. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Conference | 11/16/2011 | 11/18/2011 | 11/17/2011 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Conference | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Jim Storey
|
|
|
meet at Greg''s cube Phone #: ###-#### >> Inspection requested via web by Greg Kirkes ok for first layer of gyp on 3hr wall in stair tower north side of bld 50# link.
|
BLD-Framing/Rough-in | 11/4/2011 | 11/7/2011 | 11/7/2011 | A | PART |
Jim Storey
|
|
|
Look at inerts 3 hour assembly. Meet at gregs cube if there is time, can always push to Monday if today''s schedule is tight Phone #: ###-#### >> Inspection requested via web by Greg Kirkes building 24 side ok for membrane aplacation.
|
BLD-Conference | 11/4/2011 | 11/4/2011 | 11/7/2011 | P | PART |
Jim Storey
|
|
|
Look at inerts 3 hour assembly. Meet at gregs cube if there is time, can always push to Monday if today''s schedule is tight Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | PART |
Jim Storey
|
|
|
Meet at Greg''s cube. If your in the area anytime works for us. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 9/15/2011 | 9/20/2011 | 9/20/2011 | A | PASS |
Jim Storey
|
|
|
inspect gas plates. Meet in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire protection instaled per listing ok.
|
BLD-Framing/Rough-in | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PART |
Jim Storey
|
|
|
reviewed fire assembly ok
|
BLD-Conference | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Jim Storey
|
|
|
Meet at the south side of the link which connects building 24D & 50. Inspect the fire rated gas plate. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes fire pillows instaled ok
|
BLD-Conference | 7/7/2011 | 7/11/2011 | 7/11/2011 | A | PART |
Jim Storey
|
|
|
Meet at Paul''s office. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 7/5/2011 | 7/7/2011 | 7/7/2011 | A | PART |
Jim Storey
|
|
|
Meet at Greg''s cube. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes reviewed aproved plan and will come back next week to address isues that were not refelected on plans.
|