Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-00974
StatusFinaled
Name PLATINUM REMODEL & REPAIR LLC
Site Address 3508 N COLLISTER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the extensive remodel / repair to an existing 1264s.f. 1-story single family dweling. the project includes the complete removal of interior floor, wall,and ceiling coverings including all insulation. All plumbing and electrical is updated as needed and the furnace and ductwork is replaced due to water damage. There will be select interior wall framing and plumbing to create a new bedroom and bathroom along with the reconfiguration of the kitchen area. Separate electrical, plumbing and mechanical permits are required. R-1C ok per Sue Cummings. all per the approved plans as marked energy option for best method with existing 2 x 4 construction and the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20118/2/20118/2/2011PPASS
DetailsTony Young
Rick Phone #: ###-####
BLD-Final8/1/20118/2/20118/2/2011APASS
DetailsTony Young
Rick Phone #: ###-####
DOC - Permit Finaled8/2/20118/2/20118/2/2011PPASS
DetailsTony Young
signed paperwork
BLD-Energy code compliance6/17/20116/21/20116/21/2011APASS
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####
BLD-Energy code compliance6/16/20116/17/20116/20/2011PFAIL
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####,,, need mechanical inspection pass 1st
BLD-Energy code compliance6/15/20116/16/20116/16/2011ANR
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, need mechanical pass
BLD-Framing/Rough-in6/14/20116/15/20116/15/2011PPART
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, mech failed but ok to insulate the walls
BLD-Framing/Rough-in6/14/20116/14/20116/14/2011PPART
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, need mech inspection,,, ok to insulate walls pending mech pass
BLD-Framing/Rough-in6/14/20116/14/20116/14/2011PNR
DetailsTony Young
rick - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, needs mechanical 1st,, conf only