Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD11-01058
StatusFinaled
Name KMO INC
Site Address 625 W IDAHO ST
Project NameCITY HALL ANNEX-1ST FLR
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE – 1st Floor – Human Resources) Permit is to remodel existing 2,340 square foot office area previously occupied by IT. PLAN MODIFICATION 3-8-13 – Modification submitted to add an exterior entrance canopy onto the existing HR entrance. Installation per attached engineering and referenced CZC11-00231.**TLW** Approval per approved plans on file. Work to include: [installation / demolition of interior partition walls to create a reception area, five new offices, a conference room, a file room, and open office area], new lighting, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/11/201310/14/201310/14/2013APASS
DetailsDave Hannah
DOC - Permit Finaled10/14/201310/14/201310/14/2013PPASS
DetailsDave Hannah
BLD-Final11/9/201111/9/201111/9/2011PPASS
DetailsDave Hannah
corey Phone #: ###-####
FIRE-Final Inspection11/9/201111/9/201111/9/2011PPASS
DetailsForrest France
Fire life safety finaled. Missing door hardware at one location to be verified at structural final.
BLD-Final11/7/201111/8/201111/8/2011AFAIL
DetailsDave Hannah
corey Phone #: ###-#### needs fire finals
FIRE-Final Inspection11/7/201111/7/201111/7/2011PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm permit has passed.
BLD-Other11/2/201111/2/201111/3/2011PPASS
DetailsDave Hannah
ceiling grid//Corey Phone #: ###-####
BLD-Other10/13/201110/14/201110/14/2011APART
DetailsDave Hannah
corey, ceiling grid Phone #: ###-#### >> Inspection requested via web by corey gillaspy ok to cover after elec still need to check wall bracing
BLD-Framing/Rough-in9/9/20119/12/20119/12/2011APASS
DetailsDave Hannah
cory Phone #: ###-####
BLD-Conference8/17/20118/17/20118/17/2011PDONE
DetailsDave Hannah
Conference on penetrations of west wall above ceiling between print shop and new space. Fire blocking required.