BLD-Final | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | PASS |
Mike Jordan
|
|
|
1:30 -- Steve Phone #: ###-####
|
DOC - Permit Finaled | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | PASS |
Mike Jordan
|
|
|
Letter of completion was issued.
|
FIRE-Final Inspection | 2/14/2012 | 2/15/2012 | 2/16/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Conference | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | DONE |
Troy Cobbley
|
|
|
The Fabric store and Precision Bicycle canopies do not appear to require concealed space fire protection in the new buildout areas.
|
FIRE-Conference | 9/13/2011 | 9/14/2011 | 9/14/2011 | P | CANC |
Troy Cobbley
|
|
|
overbooked
|
BLD-Framing/Rough-in | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | PASS |
Mike Jordan
|
|
|
Framing inspection for canopies @ Galaxy Golf & Bike Shop Phone #: ###-#### >> Inspection requested via web by Pam Bullock
|
FIRE-Conference | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Steve Hill and Josh about the fire protection requirements for this project. I agreed to let them continue to cover if adequate access is provided to all areas needing inspection from the interior of the soffits or from the roof. This access is required to verify sprinkler installation or the installation of non-combustible insulation when they are installed.
|
BLD-Framing/Rough-in | 8/30/2011 | 8/31/2011 | 8/31/2011 | P | PART |
Mike Jordan
|
|
|
Inspection of canopy framing at Home Fabrics Phone #: ###-#### >> Inspection requested via web by Pam Bullock Exterior steel studs ok.
|
FIRE-Conference | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | DONE |
Troy Cobbley
|
|
|
Noticed construction continuing with no fire inspection being called in. Stopped in to speak with the general contractor about possible fire sprinkler issues/requirements due to new combustible construction. I let the company owner know that he should consult with a sprinkler contractor on possible modifications prior to a fire lifesafety final.
|
BLD-Framing/Rough-in | 8/19/2011 | 8/22/2011 | 8/22/2011 | P | PASS |
Mike Jordan
|
|
|
Framing inspection for Office Max Phone #: ###-#### >> Inspection requested via web by Pam Bullock. Steel stud framing and wood framing ok.
|
BLD-Footing | 8/15/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Mike Jordan
|
|
|
Contact Steve Hil This is for Performance Bicycle Footing/foundation Phone #: ###-#### >> Inspection requested via web by Pam Bullock. Lot line adjustment has been approved..
|
BLD-Framing/Rough-in | 8/2/2011 | 8/5/2011 | 8/5/2011 | A | PART |
Tom Arcoraci
|
|
|
Steve Hill, contact inspection at TJ Maxx and DSW. Phone #: ###-#### >> Inspection requested via web by Pam Bullock wip ok ext
|
BLD-Conference | 8/1/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Jim Storey
|
|
|
steve ( 8:30 am draft stops fire blocking ) Phone #: ###-####
|
BLD-Footing | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Mike Jordan
|
|
|
Footing inspection at Home Fabric & Galaxy Golf Phone #: ###-#### >> Inspection requested via web by Pam Bullock
|
BLD-Footing | 7/16/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
Steve Hill - person in charge Phone #: ###-#### >> Inspection requested via web by Pam Bullock
|
BLD-Final | 2/15/2012 | 2/16/2012 | | A | |
Mike Jordan
|
|
|
|
BLD-Final | 2/14/2012 | 2/15/2012 | | P | |
Mike Jordan
|
|
|
steve Phone #: ###-####
|