Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD11-01175
StatusFinaled
Name HILL CONSTRUCTION CO
Site Address 8501 W FRANKLIN RD
Project NameFranklin Towne Plaza-Phase 4
Customer Number 
ePlanReviewNo
Description
(FRANKLIN TOWNE PLAZA-PHASE 4 EXTERIOR REMODEL) Permit is to remodel an existing shopping complex including multiple properties and buildings (Buildings separated by two hour fire walls). NOTE – Performance Bikes canopy is on a property line. The architect has submitted a lot line adjustment. Until adjustment is approved no construction is to begin on this canopy. Check with Tim W. to see if adjustment is approved.**TLW** These buildings are fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file, attached engineering, and plan review report. Work to include: remodeling of existing canopies including: new roof construction, new column build outs, and new finish materials. These buildings are fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to these buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20122/28/20122/28/2012PPASS
DetailsMike Jordan
1:30 -- Steve Phone #: ###-####
DOC - Permit Finaled2/28/20122/28/20122/28/2012PPASS
DetailsMike Jordan
Letter of completion was issued.
FIRE-Final Inspection2/14/20122/15/20122/16/2012APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Conference9/14/20119/15/20119/15/2011ADONE
DetailsTroy Cobbley
The Fabric store and Precision Bicycle canopies do not appear to require concealed space fire protection in the new buildout areas.
FIRE-Conference9/13/20119/14/20119/14/2011PCANC
DetailsTroy Cobbley
overbooked
BLD-Framing/Rough-in9/12/20119/13/20119/13/2011APASS
DetailsMike Jordan
Framing inspection for canopies @ Galaxy Golf & Bike Shop Phone #: ###-#### >> Inspection requested via web by Pam Bullock
FIRE-Conference9/12/20119/13/20119/13/2011ADONE
DetailsTroy Cobbley
I spoke to Steve Hill and Josh about the fire protection requirements for this project. I agreed to let them continue to cover if adequate access is provided to all areas needing inspection from the interior of the soffits or from the roof. This access is required to verify sprinkler installation or the installation of non-combustible insulation when they are installed.
BLD-Framing/Rough-in8/30/20118/31/20118/31/2011PPART
DetailsMike Jordan
Inspection of canopy framing at Home Fabrics Phone #: ###-#### >> Inspection requested via web by Pam Bullock Exterior steel studs ok.
FIRE-Conference8/30/20118/30/20118/30/2011PDONE
DetailsTroy Cobbley
Noticed construction continuing with no fire inspection being called in. Stopped in to speak with the general contractor about possible fire sprinkler issues/requirements due to new combustible construction. I let the company owner know that he should consult with a sprinkler contractor on possible modifications prior to a fire lifesafety final.
BLD-Framing/Rough-in8/19/20118/22/20118/22/2011PPASS
DetailsMike Jordan
Framing inspection for Office Max Phone #: ###-#### >> Inspection requested via web by Pam Bullock. Steel stud framing and wood framing ok.
BLD-Footing8/15/20118/16/20118/16/2011PPASS
DetailsMike Jordan
Contact Steve Hil
This is for Performance Bicycle Footing/foundation Phone #: ###-#### >> Inspection requested via web by Pam Bullock. Lot line adjustment has been approved..
BLD-Framing/Rough-in8/2/20118/5/20118/5/2011APART
DetailsTom Arcoraci
Steve Hill, contact
inspection at TJ Maxx and DSW. Phone #: ###-#### >> Inspection requested via web by Pam Bullock wip ok ext
BLD-Conference8/1/20118/2/20118/2/2011APASS
DetailsJim Storey
steve ( 8:30 am draft stops fire blocking ) Phone #: ###-####
BLD-Footing7/25/20117/26/20117/26/2011APASS
DetailsMike Jordan
Footing inspection at Home Fabric & Galaxy Golf Phone #: ###-#### >> Inspection requested via web by Pam Bullock
BLD-Footing7/16/20117/18/20117/18/2011APASS
DetailsMike Jordan
Steve Hill - person in charge Phone #: ###-#### >> Inspection requested via web by Pam Bullock
BLD-Final2/15/20122/16/2012 A 
DetailsMike Jordan
BLD-Final2/14/20122/15/2012 P 
DetailsMike Jordan
steve Phone #: ###-####