BLD-Final | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
DOC - Permit Finaled | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Mike Jordan
|
|
|
Certificate of completetion was issued.
|
BLD-Energy code compliance | 6/30/2011 | 7/1/2011 | 7/1/2011 | P | PASS |
Mike Jordan
|
|
|
rick - wall insulation in the conditioned space Phone #: ###-####
|
BLD-Framing/Rough-in | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. All issues resolved. ok to insulate and ok to sheetrock at non conditioned areas.
|
BLD-Framing/Rough-in | 6/29/2011 | 6/29/2011 | 6/29/2011 | P | FAIL |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Fireblock at furout walls at new garage wall to exisiting at top plates as well as at existing roof line, fire stop all penetrations into top plates and complete airseal package at conditioned spaces. Correction notice was posted.
|
BLD-Foundation | 6/21/2011 | 6/22/2011 | 6/22/2011 | A | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/21/2011 | 6/21/2011 | 6/21/2011 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Noted that gas line needed to be moved.
|