BLD-Conference | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/30/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Tom Arcoraci
|
|
|
gregory Phone #: ###-####
|
DOC - Permit Finaled | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/3/2012 | 1/3/2012 | 1/3/2012 | P | PART |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####. Framing ok to cover after electrical rough in inspection is completed. Needs to provide tempered glazing on window at top of stairs.
|
BLD-Framing/Rough-in | 11/23/2011 | 11/25/2011 | 11/25/2011 | A | NR |
Tom Arcoraci
|
|
|
tiffany Phone #: ###-#### needs all rough ins
|
BLD-Conference | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Tom Arcoraci
|
|
|
needs designer and contractor to finnish project
|
BLD-Conference | 9/9/2011 | 9/9/2011 | 9/9/2011 | A | DONE |
Bob Archibald
|
|
|
Mike J and I conducted a site visit based on complaint by contractor of excessive frost protection requirements. Upheld inspectors original notice, contractor chose method to construct footing and foundation.
|
BLD-Framing/Rough-in | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PART |
Tom Arcoraci
|
|
|
kevin Phone #: ###-#### ok to side
|
BLD-Other | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Footing | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
kapp please call 30 min before going out so that he can be there. Phone #: ###-####
|
BLD-Footing | 7/14/2011 | 7/15/2011 | 7/15/2011 | P | PART |
Mike Jordan
|
|
|
kevin - after 4 please Phone #: ###-####. Excavation not deep enough. Needs to excavate out more material. Contractor noted that he wanted to place concrete in footings on saturday. Noted to contractor that he excepts all liability if it is determined that excavation is not deep enough on stemwall inspection.
|