BLD-Final | 5/9/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Tom Arcoraci
|
|
|
Please call Jim Greenwood 20 minutes prior to inspection, so building can be sure to be open. (If no one is on site, the man door to the garage should be open.) Phone #: ###-#### >> Inspection requested via web by James Greenwood ok per plan 408
|
DOC - Permit Finaled | 5/11/2012 | 5/11/2012 | 5/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 5/9/2012 | 5/11/2012 | 5/9/2012 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood Inspection cancelled from web by: James Greenwood
|
FIRE-Final Inspection | 5/7/2012 | 5/8/2012 | 5/8/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | DONE |
Troy Cobbley
|
|
|
JIm Greenwood and I went over the outside alarm bell placement. We also discussed how the bell was activated and wiring layout. We also discussed mag locks on the main exit and I deferred him to plan review for answers since this since access/egress control issues were not addressed on the plans.
|
BLD-Wall cover | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood Energy OK
|
BLD-Framing/Rough-in | 12/2/2011 | 12/5/2011 | 12/5/2011 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood
|
BLD-Foundation | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Jim Storey
|
|
|
wesley - early afternoon - please call 1/2 hr prior Phone #: ###-####
|