Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-01720
StatusFinaled
Name WALLACE RENOVATIONS
Site Address 457 E PARKCENTER BLVD
Project NameSage International School
Customer Number 
ePlanReviewNo
Description
(SAGE INTERNATIONAL SCHOOL OF BOISE) This building is fully sprinklered with alarm system. To divide existing 860 sq. ft. school classroom into two separate 430 sq. ft. classrooms for elementary school grade. Work will include construction of a non-bearing wall, approximately 21' - 6" in length, from floor to bottom of existing ceiling. Wall will be braced to structure above with alternating braces at 4' o.c. There will be no electrical, plumbing or mechanical in the new wall. The original classroom was created as part of BLD10-01112. Separate applications, plans and permits are required before any modifications to existing sprinkler system and alarm system begin, as regulated by the fire department. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/10/20118/11/20118/11/2011APASS
DetailsJim Storey
guy Phone #: ###-####
DOC - Permit Finaled8/11/20118/11/20118/11/2011PPASS
DetailsJim Storey
FIRE-Final Inspection8/11/20118/11/20118/11/2011PPASS
DetailsForrest France
Fire life safety inspection passed.