BLD-Final | 11/15/2011 | 11/16/2011 | 11/16/2011 | A | PASS |
Dave Hannah
|
|
|
Ashley-Please call prior to inspection Phone #: ###-#### ok for perm occ
|
BLD-Aging Inspection | 10/17/2011 | 10/17/2011 | 10/18/2011 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/15/2011 | 8/16/2011 | 8/16/2011 | A | PASS |
Forrest France
|
|
|
C/N items verified for completion. Life safety inspection passed.
|
BLD-Final | 8/12/2011 | 8/15/2011 | 8/16/2011 | P | PART |
Dave Hannah
|
|
|
Ashley-occupancy Phone #: ###-#### ok for temp occ needs handrail on stairs to area above kitchen and door hardware for door out back of kitchen
|
FIRE-Final Inspection | 8/12/2011 | 8/15/2011 | 8/15/2011 | A | FAIL |
Forrest France
|
|
|
C/N items include removal of the curtain obstructing the egress path to the second exit, remove storage at the exit corridor, provide cover and approved terminals at the exposed eletrical wiring on the mezzanine level, remove padlock at the cooler door. See items #3 and 6 on the permit documents.
|