BLD-Final | 9/14/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Jim Storey
|
|
|
camilla Phone #: ###-#### final ok pending plm sign off.
|
FIRE-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | PASS |
Forrest France
|
|
|
Life safety pass pending approved hardware at the exterior vestibule door to be completed by building owner. Latch at the door knob from the tenant space disabled. Remainder of C/N items finished.
|
FIRE-Final Inspection | 9/9/2011 | 9/12/2011 | 9/12/2011 | A | FAIL |
Forrest France
|
|
|
C/N items incomplete
|
BLD-Final | 9/9/2011 | 9/12/2011 | 9/12/2011 | P | CANC |
Dave Hannah
|
|
|
camilla Phone #: ###-####//cancelled by tenant rep, told her need to get elec and plm finaled.
|
FIRE-Final Inspection | 9/9/2011 | 9/9/2011 | 9/9/2011 | P | FAIL |
Forrest France
|
|
|
See items #1,2,3,and 4 on list of general requirements attatched to the permit documents for items needed prior to final approval.
|
BLD-Final | 9/9/2011 | 9/9/2011 | 9/9/2011 | P | NR |
Dave Hannah
|
|
|
camilla Phone #: ###-#### needs fire to final first
|