BLD-Final | 12/2/2011 | 12/5/2011 | 12/5/2011 | P | PASS |
Tony Young
|
|
|
Randy Please call 30 min before going out Phone #: ###-####
|
FIRE-Final Inspection | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Contractor to replace the round hardware with lever at the existing restroom door.
|
BLD-Framing/Rough-in | 11/9/2011 | 11/10/2011 | 11/10/2011 | A | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####
|
BLD-Final | 11/8/2011 | 11/9/2011 | 11/9/2011 | P | PART |
Tony Young
|
|
|
Randy Phone #: ###-####,, frame ok,,, not ready for a final
|
BLD-Framing/Rough-in | 11/8/2011 | 11/9/2011 | 11/9/2011 | A | NR |
Tony Young
|
|
|
Randy Phone #: ###-####,,,
|
BLD-Framing/Rough-in | 11/4/2011 | 11/7/2011 | 11/7/2011 | A | PART |
Tony Young
|
|
|
randy - please call prior so he can meet you there Phone #: ###-####,, conf only,, need trades 1st
|