BLD-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 | P | PART |
Dave Hannah
|
|
|
Doors are complete. Permit plans are in corner by electrical panel (near hallway). Thanks! Phone #: ###-#### >> Inspection requested via web by Todd Weltner ok for temp occ ok for perm occ after bldg is finaled.
|
BLD-Final | 12/16/2011 | 12/20/2011 | 12/20/2011 | A | DONE |
Dave Hannah
|
|
|
Todd please call before going out so he can meet you Phone #: ###-####
|
BLD-Final | 12/20/2011 | 12/20/2011 | 12/20/2011 | P | PART |
Dave Hannah
|
|
|
Todd please call before going out so he can meet you Phone #: ###-#### ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac also needs to install doors and finish ada restrooms
|
FIRE-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety final okay pending missing doors and hardware are installed and verified for compliance at structural final.
|
FIRE-Final Inspection | 12/16/2011 | 12/19/2011 | 12/19/2011 | P | NR |
Forrest France
|
|
|
Project related FIR trade permits need finaled, missing doors and hardware at some locations.
|
BLD-Wall Bracing | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PART |
Dave Hannah
|
|
|
Electrical & Fire sprinkler ceiling inspections expected in a.m., so ceiling inspection requested for later in the a.m. Please call to let me know when inspector will be onsite. Phone #: ###-#### >> Inspection requested via web by Todd Weltner ok to cover ceioling after fire oks
|
BLD-Framing/Rough-in | 11/23/2011 | 11/23/2011 | 11/23/2011 | A | PART |
Tom Arcoraci
|
|
|
Elec. inspection also due 11/23 a.m., so later inspection would be appreciated. Thanks, Todd Phone #: ###-#### >> Inspection requested via web by Todd Weltner check wall strut bracing at grid inspection
|