Permit Number | BLD11-02482 |
Status | Finaled |
Name |
DURANGO BUILDING CO LLC
|
Site Address |
3083 S BOWN WAY
|
Project Name | BOISE FRY COMPANY- Bldg E |
Customer Number | |
ePlanReview | No |
Description |
(BOISE FRY COMPANY – Bown Crossing Market Place - Bldg “E”) Permit is to remodel an existing 3,568 square foot restaurant by diving it into two spaces, this tenant space will be 1,945 square feet. The remainder of the unoccupied space is 1,623 square feet. The remainder space will require separate permits before it can be occupied for any reason. PLAN MODIFICATION 12-1-11 – Modification submitted to replace storefront glazing with a new double exterior door and minor interior ceiling / lighting changes.**TLW** PLAN MODIFICATION 12-14-11 – Modification submitted to remove the canopy and new exterior doors from this permit. The architect identified they will be submitted under a separate permit.**TLW** Approval contingent upon adhering to the approved plans on file. Work to include: demolition of existing non-bearing walls, installation of new nonbearing walls, installation of new equipment, relocation of existing lights for new restroom location, installation of new plumbing, minor mechanical, new millwork, and interior finishes in compliance with chapter 8 of the 2006 IBC. Nonseparated Uses per IBC Section 302.3.2. A Certificate of Occupancy is to be issued when completed and approved. NOTE: The second floor above was constructed as a one-hour rated floor assembly with one-hour rated supporting beams and columns under the shell permit. This floor supports the one-hour rated stair enclosure walls on the second floor. Shafts through this floor were also shown as at least one-hour rated. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. PLAN MODIFICATION 12-1-11 – Modification submitted to replace storefront glazing with a new double exterior door and minor interior ceiling / lighting changes. PLAN MODIFICATION 12-14-11 – Modification submitted to remove the canopy and new exterior doors from this permit. The architect identified they will be submitted under a separate permit.**TLW**
|