Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-02773
StatusFinaled
Name ANDERSON CONSTRUCTION COMPANY
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG 6
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD)(BLDG 6 FAB - INTERIOR DEMOLITION & REPAIR) Select interior demolition work to change approximately 23,200 sq. ft. in the basement plus 28,200 sq. ft. on lower level and completely remove 1,024 sq. ft. of mechanical mezzanine, a total of 52,428 sq. ft. of existing 160,000 sq. ft., 2 level building (approx. 80,000 sq. ft. per level) back into vanilla shell and core space for future tenants per approved plans. Former use of the area of this scope of work was a fabrication facility. The work area is located on the south half of the building from the interior corridor south wall to the exterior south wall of the building and from the east side of the existing 2-hour area separation wall to the grid line S & S.5 on the plans. Work to include removal or modification of equipment, electrical, mechanical, plumbing, fire sprinkler and alarm systems; infill of openings in concrete created by removal of equipent; interior finish of damaged areas; restoration and maintenance of the fire-life in preparation for future tenant. NOTE: This building is fully fire sprinklered for allowable area increase. The existing 2-hour area separation wall along grid line C.5 up through the building created HP#6 East & HP#6 West, providing code compliance with allowable area for type of construction for the mixed use occupancy. All existing rated assemblies as indicated on plans are to be maintained. No additional interior work is allowed under this permit and no occupancy or use is being established. Separate plans, application, approval and permits are required for any future tenant improvements or occupancy of the indicated floor areas. Separate fire sprinkler plans and permits and alarm plans and permits are required as regulated by the Boise Fire Department. All fire and life safety systems (exiting, sprinklers, alarms, etc.) shall be maintained operational at all times during this scope of work unless specifically approved by the fire department. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/29/20123/29/20123/29/2012PPASS
DetailsJim Sly
JIM Phone #: ###-####
C/C issued.
DOC - Permit Finaled3/29/20123/29/20123/29/2012PPASS
DetailsJim Sly
FIRE-Final Inspection3/29/20123/29/20123/29/2012APASS
DetailsTroy Cobbley
Life safety passed
BLD-Concrete2/23/20122/24/20122/24/2012APART
DetailsJim Sly
Call for access Phone #: 2085735147 >> Inspection requested via mobile web by Jim Martin
MTI inspections for concrete floor infill of holes left by removal of equipment......OK