Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-03041
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 8300 W OVERLAND RD
Project NameWALMART STORE #2508
Customer Number 
ePlanReviewNo
Description
(WALMART REMODEL - Store # 2508) To remodel an existing 216,174 square foot retail store. Work to include: refurbish restroom entrance to create an accessible walkway, installation of new flooring finishes, new exterior lighting, new plumbing, new accessible counters, remodel auto center oil collection system, expand existing class I hood, install new exhaust fan on the roof, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: a separate sign permit is required before exterior signage is installed. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/26/201212/27/201212/27/2012APASS
DetailsJim Storey
Request closeout of permit based on rack anchor inspections and calculations that were emailed to Mike Jordan on 12/18/12. Please contact Ron Hagen at ###-#### or rhagen@sletteninc.com if additional information is required. Phone #: ###-#### >> Inspection requested via web by Ron Hagen
DOC - Permit Finaled12/27/201212/27/201212/27/2012PPASS
DetailsJim Storey
BLD-Final7/19/20127/19/20127/19/2012PPART
DetailsMike Jordan
Ron Haggen-Please call prior to inspection Phone #: ###-####. Needs to provide special inspection for the anchors installed for existing racking.
BLD-Final7/11/20127/11/20127/11/2012PNR
DetailsMike Jordan
ron Phone #: ###-#### - call 30 mins prior. Needs mech. final.
FIRE-Final Inspection7/10/20127/11/20127/11/2012APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Conference6/22/20126/22/20126/22/2012PDONE
DetailsTroy Cobbley
I went over the outstanding life safety corrections with Cheryl, a walmart manager.
BLD-Final4/30/20125/3/20125/3/2012PNR
DetailsMike Jordan
We are requesting our building final instection for Thursday afternoon, 5/3/12. Phone #: ###-#### >> Inspection requested via web by Ron Hagen
FIRE-Final Inspection5/3/20125/3/20125/3/2012AFAIL
DetailsForrest France
Noted items include; missing exit signs per approved plan, door holders per sheet E2 are not yet installed, missing ceiling tile and escutcheons adjacent to the new type one hood. A fire alarm permit will be necessary to complete door holder and smoke detection work. Project related fire sprinkler permit needs request for inspection and final. See attatched fire code review notes for details.