Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-00052
StatusFinaled
Name JH DEVELOPMENT INC
Site Address 1708 S DRACO PL
Project NameJackson Home
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 4,400 sq. ft., two story (first story1,657 sq. ft., second story 2,743 sq. ft.) single family dwelling with 5 bedrooms, 3 1/2 bathrooms, approximately 668 sq. ft. of covered patio/porch and a 1,260 sq. ft.attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planniing. CDM This structure is located in WUI zone A and requires a class A fire rated roofing material, noncombustible exterior siding products and one hour fire rated soffits. Home must have fire sprinklers modfied 13D fire sprinkler system per sub-division plat note #19. In addition, to the requirments of 13D, the system shall be modified to provide sprinkers in all closets bathrooms and foyers, and all attached garages shall be protected with a single row of sprinklers along the wall between the house and the garage.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/201210/17/201210/17/2012APASS
DetailsDave Hannah
Jeff Phone #: ###-####
DOC - Permit Finaled10/17/201210/17/201210/17/2012PPASS
DetailsDave Hannah
BLD-Final10/12/201210/12/201210/14/2012PNR
DetailsDave Hannah
Jeff Phone #: ###-####
BLD-Wall Bracing7/10/20127/10/20127/10/2012PPASS
DetailsDave Hannah
BLD-Energy code compliance7/9/20127/10/20127/10/2012PPASS
DetailsDave Hannah
ERIC Phone #: ###-####
BLD-Framing/Rough-in7/9/20127/10/20127/10/2012PPASS
DetailsDave Hannah
ERIC Phone #: ###-####
BLD-Framing/Rough-in7/2/20127/3/20127/3/2012PPART
DetailsDave Hannah
Jeff Phone #: ###-#### ok to insulate c/n on site shear ok but for five columns on west side
BLD-Foundation4/16/20124/16/20124/16/2012PPASS
DetailsDave Hannah
we should be ready by 1:00 Phone #: ###-#### >> Inspection requested via web by Jay Jones
BLD-Footing4/13/20124/13/20124/13/2012PPART
DetailsDave Hannah
requested time early pm around 1
Thank You Phone #: ###-#### >> Inspection requested via web by Jay Jones garage ftgs ok to place concrete
BLD-Footing4/13/20124/13/20124/13/2012ANR
DetailsDave Hannah
requested time late morning
Thank You Phone #: ###-#### >> Inspection requested via web by Jay Jones
BLD-Foundation4/5/20124/5/20124/5/2012APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Jay Jones basement walls ok to place
BLD-Footing3/27/20123/28/20123/28/2012APART
DetailsDave Hannah
Jay Phone #: ###-#### >> Inspection requested via web by Jay Jones ok to pour lower ftgs