Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD12-00102
StatusFinaled
Name ESI
Site Address 650 N ARMSTRONG PL
Project NameWINCO FOODS
Customer Number 
ePlanReviewNo
Description
(WINCO CORORATE OFFICES) Permit is to remodel an existing 73,030 square foot office building by installing glass systems partitions in place of traditional partition walls. Approval contingent upon adhering to the approved plans on file. Both the old building and the new addition were constructed after 1997 when quick response heads were required, therefore, rated corridors are not required within this building. Work to include: demo of interior non-bearing walls, installation of new glass system partition walls, minor electrical, minor mechanical, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20126/14/20126/14/2012PPASS
DetailsJim Storey
Late afternoon would be preferable. Please call me an hour before if possible in order to meet you onsite. Thank You Phone #: ###-#### >> Inspection requested via web by Chris Palmer
FIRE-Final Inspection6/14/20126/14/20126/14/2012PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Framing/Rough-in6/4/20126/4/20126/4/2012PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud partial height framed walls for new cubicles ok.
BLD-Final5/25/20125/29/20125/29/2012ACANC
DetailsMike Jordan
please call Dave-###-#### with any questions >> Inspection requested via web by nate hutton
BLD-Framing/Rough-in4/24/20124/24/20124/24/2012PPASS
DetailsMike Jordan
framing inspection- please call Dave prior to site inspection-###-#### Phone #: ###-#### >> Inspection requested via web by nate hutton. Box headers for new glass office fronts ok.
BLD-Framing/Rough-in4/23/20124/23/20124/23/2012PFAIL
DetailsMike Jordan
please call Dave prior to inspection and he can meet you on-site. Thanks, Phone #: ###-#### >> Inspection requested via web by nate hutton. Needs to remove sheetroc for inspection.
BLD-Framing/Rough-in3/28/20123/28/20123/28/2012PPASS
DetailsMike Jordan
Please contact Dave at the above number. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in3/8/20123/9/20123/9/2012APASS
DetailsMike Jordan
Call prior to inspection for direction to plans and locations.
Thanks,
Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Box headers for new glass system ok.
BLD-Framing/Rough-in3/5/20123/5/20123/5/2012PPASS
DetailsMike Jordan
Please call prior to inspection- will meet to walk through the building. Dave Minegar ###-#### Phone #: ###-#### >> Inspection requested via web by nate hutton. Interior steel walls for office cubes.