BLD-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | A | PASS |
Jim Sly
|
|
|
Redgie Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | FAIL |
Jim Sly
|
|
|
please call ahead for access - Redgie Phone #: ###-#### Need Smoke Det and C02 in Basement.
|
BLD-Energy code compliance | 5/29/2012 | 5/29/2012 | 5/29/2012 | P | PASS |
Jim Sly
|
|
|
Reggie Phone #: ###-####
|
BLD-Framing/Rough-in | 5/24/2012 | 5/25/2012 | 5/25/2012 | A | PASS |
Jim Sly
|
|
|
reggie Phone #: ###-#### Verified Engineering from Alpine Engineering....Phil Hart....OK'ing Existing basement intermediate footing to carry point load for N. end of micro lam beams .... Center of house.
|
BLD-Footing | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | CANC |
Jim Sly
|
|
|
Not ready....Need approved plans and Contractor to Meet with me on site to verify location of inspection.
|
BLD-Other | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | PASS |
Jim Sly
|
|
|
rebar -- Michael Phone #: ###-####
|
BLD-Footing | 2/15/2012 | 2/15/2012 | 2/16/2012 | P | PASS |
Jim Sly
|
|
|
michael Phone #: ###-####
|
BLD-Footing | 2/10/2012 | 2/13/2012 | 2/13/2012 | A | NR |
Jim Sly
|
|
|
pouring concrete at 10 -- Eric Phone #: ###-####
|